Page 93 - Regal ideas Binder_USA_2020
P. 93

urbanrail                    ®                                 Installation Instructions




        Gate Installation (URGP)

        (Gate is designed to fit an opening of up to 36” )



                                                                      Max 36”










         Gate kit includes one pair of   Gate assembly requires ¾”   Gate is designed to fit an   Place welded bracket of top
         hinges, pickets and spacers,   self-drilling screws (URCS50   opening of up to 36” and the   rail under post cap.
         hinge post, latch post, strike   sold separately)   width may be cut to fit.
         latch, and top & bottom rails                       For opening smaller than         Top of bracket should
         with welded flanges on one                          36”, subtract 6” from the          be touching the under-
         end.                                                clear opening distance (i.e.         side of the post cap.
                                                             34” opening – 6” = 28” rails).
                                                             This is the length to cut the
                                                             rails.







                                                                           34”






             TIP: Pre-drill using 1/8”   Attach the welded bracket   Measure from underside of   Repeat steps and attach
             (3mm) drill bit.      to the post using a URCS50   top rail welded bracket 34”.  bottom rail to post.
                                   screw (sold separately).  This will be the position of
                                                             the top of the bottom rail
                                                             bracket.
















        Next step is to attach the   Pre-dirll on the underside of   Repeat step for bottom rail.  Drill holes every 16” - 24” in/
        post with the welded brack-  the welded top post bracket,                     through the bottom rail for
        ets to the top and bottom   through the top rail.                             water drainage, using a 3/8”
        rails.                                                                        diameter drill bit.
                                  Fasten the post to th rails
                                  using the URCS50 screws
                                  (sold separately)






         regalideas.com/urbanrail  |  Toll Free: 1-800-819-4344  |  Fax: 1-604-952-4291  |  email: sales@regalideas.com  9
                                                                                                             V2
   88   89   90   91   92   93   94   95   96   97   98