Page 8 - Anglia Fixing Ltd Case Studies
P. 8

Medical Business Innovation Centre, Anglian Ruskin University.




















































                Comar Architectural Aluminium Systems, with their approved fabricator Anglia Fixing Ltd; completed work on the 6 million   PROJECT DETAILS
                pound project, The MedBIC Centre, a 3-storey modern commercial building. The Anglia Ruskin University Medical
                Business Innovation Centre (MedBIC) will support new medical technology companies.  It houses engineering research   Architects:
                laboratories, offices and meeting space. Anglia Ruskin, Chelmsford City Council and Essex County Council all   Emptage Architects
                collaborated on this project , which is projected to create over 120 jobs in its first 3 years, helping Essex become a
                world-renowned centre of excellence for innovation.                        Fabricator:
                Comar 6EFT 4sided SG was selected as it offers architects a flexible system, providing a structurally glazed solution,   Anglia Fixing Ltd
                with options for facets, concealed vents and an extensive range of profiles that cater for large structurally glazed panes.
                Comar 6EFT 4sided SG also offers the slimmest silicon or EPDM joints in the industry, which means the eye catching   Main Contractor:
                glazed area is maximised.                                                  Morgan Sindall PLC

                In a busy educational development Comar 7 and Comar 7P.i CD systems are a natural choice as they have been   Project Value:
                designed specifically to be suitable for high traffic, public applications.  The entrance doors to the building were required    £223,000
                to comply with the Disability & Equality Act 2010.
                                                                                           System Used:
                 All Comar approved fabricators are required to have the technical expertise to attend pre-site meetings and provide   Comar 6EFT Structural Glazing
                 detailing.  Anglia Fixing liaised closely with the specifiers to provide design advice and detailing which ensured the   (4 Sided) with Top Hung Vents,
                  project ran smoothly and met site deadlines.                             Comar 7P.i CD
                                                                                           Location: Chelmsford, Essex
   3   4   5   6   7   8   9   10   11   12   13