Page 45 - TCL International VILLETA BUSINESS PLAN AND FEASABILITY STUDY
P. 45

Table FA3: Investments Required

                     A.  Civil Works
                                                                      Des
                     Description                               US$                         cription             US$

                     Fencing, internal roads, container               1-Truck unloader
                     yard levelling, topographic works,               1-Reception grain belt
                     grown movement and filling,
                     reinforced structure, reinforced                 2-Backet elevators
                     walls, dreinageandventilation,                   2-Conveyor belts
                     machine room, bathroom, others.                  1-Grain sweep thread

                     Base for silo, underground                       1-Hopper machine
                     conveyor, grain system                           1-Grain belt loader
                     infrastructure.                                  1-Open gateway

                     Office upgrade, office equipment,                1-Strap support for loading
                     communication system, caffeteria,                Set of reefer plugs, 40 units
                     control/ guard house upgrade.                    Automatic cold storage unit
                                                                      1-Transformer
                     Total civil works                     2,782,350.00
                                                                      1-Computer system

                     B.  Machinery and Equipment                      1-Sofia System
                                                                      Set of office equipment
                     1-Reach stacker 45 t.                            Set of shelves and racks
                     1-Fork lift 10 t.                                Paneling
                     1-Fork lift 3 t.                                 Electric system
                     1-Weigh scale w/ electronic system               Other services
                     1-Generator , 400 kVA.                           Fire protection system
                     1-SS silo / 2,000 t.                             Assembling accessories
                     1-External staircase w/ cage                     Electric system
                     1-Internal staircase                             Mechanical assembly
                     1-Roof ladder                                    Total machinery and
                     1-Silo stair for access door                     equipment                          3,406,422.43
                     1-Aeration system w/ gabanized stl.
                     2-High transitions for 20hp fan                  Total A + B                        6,188,772.43
                     2-Scatfco 20hp centrifugal fan                   Contingency 5%                         309,438.62
                     5-Ceiling lights
                                                                                                        6,498,211.05
                                                                      Total incl. contingency
                         Freight cost CIP - Asuncion
                                                                      Add mobile equipment                 100,000.00

                                                                      Grand Total                       6,598,211.05

                   Note: Refer to H. Ramirez report “Villeta Container Terminal Project.”