Page 21 - Going Circular_Updated 030122_flipbook
P. 21

WE BRING YOUR
        WE ARE UNIQUELY CAPABLE.
      PRODUCT TO LIFE.  We are a small team with an exceptional mix of technical



         and creative talents.










                  Test                 Make                   Plan                Produce
                  the                 Design                  the                   and
               Samples               Changes              Production             Distribute







                   TOOLING                         PROTOTYPING                     PRODUCE/DELIVER
                P&H Casters:                       P&H Casters:                     P&H Casters:

                30 to 45 days                      10 to 20 days                       45 days
             Industry Standard:                 Industry Standard:               Industry Standard:
                42 to 56 days                      28 to 42 days                       60 days


          MANUFACTURING DESIGN               SAMPLES PRODUCED                   MASS PRODUCTION
          This stage brings the custom       We produce a produc-               Your purchase order is man-
          caster to life. Our engineers      tion-grade prototype that          ufactured and filled. Time
          convert the final concept into     will look very similar to the      depends on volume and com-
          a manufacturable  caster           finished product. These pro-       plexity of design.
          design.                            totypes are great for identi-
                                             fying any trouble areas in the     SHIP TO WAREHOUSE
                                             design.
          MILESTONES                                                            Transit time depends on loca-
          Your designated project man-                                          tion of manufacture (USA or
          ager will send you milestone       FIRST ARTICLE APPROVED             international).
          updates throughout the dura-       Testing is done on the product
          tion of the tooling timeline.      grade casters. Any tooling         QC/DELIVERY
                                             adjustments are identified.        Final product review is con-
                                                                                ducted and product is shipped
          ANALYSIS & TESTING                 SAMPLES SHIPPED                    to your door.
          The testing of dies and molds      Samples are shipped to you
          is performed and corrected as      for testing and approval.
          needed.






                            From concept to delivery: we do it all.



                                                                                                             21
   16   17   18   19   20   21   22   23   24   25   26