Page 2 - March 2019 Wheel
P. 2

PRESIDENT’S UPDATE

                               By Gary Dahl, Board President
                               As  the  weather  changes  this       Replacing flooring with the same type of flooring
                               month from winter into an early       Replacing or installing new window coverings
                               spring—according to our friendly      Decorating  and  replacing  existing  appliances  with
                               groundhog,  we  welcome  more         new appliances in the same location
                               sunshine and increased time out-
                               doors.    I’m  looking  forward  to   • Prior  notification  to  Patrol  Services  regarding  vendors
                               baseball’s opening day on March     delivering related supplies and appliances is required for
        28.  Weather changes allow the Association more opportuni-  controlled  access  regardless  if  you  have  an  approved
        ties to maintain and improve our common areas.  So, as you   application or one is not required.
        walk around our beautiful property, please notify Manage-
        ment of any areas of concern.  Together we all can make a   •  A new permission for vid-
        difference in our community.                               eo doorbells is contained in
                                                                   the  PR.  Approval  by  the
        New/Revised Policies and Procedures                        Association  is  required
        PR 96 “Renovation and Architectural Modification Policies”   before  installation.  The
        and AR 2 “Renovation and Architectural Modification Re-    installed  doorbell  must
        quest  Review  Procedures”  have  been  approved  by  your   have either a nickel or sil-
        board after two Board Meetings and a Town Hall discussion.   ver finish and be placed on
        They are posted online at the Association’s website. WAL is   the  wood  surround  two
        making the renovation process as simple and time-sensitive   inches  below  the  unit’s
        as possible while ensuring projects are done to standard and   number. The doorbell can-
        in compliance with appropriate laws.  Recently, there’s been   not be installed on the door
        an increase in unit owners not obtaining approval for renova-  frame or door itself.
        tions/modifications to their units. So please review our new
        policy before you attempt a renovation and risk additional   WAL Market and Café
        costs or your project being shut down. Remember, contact   The  Market  Café  has  a  new
        the Association Office prior to renovations to ensure you are   operator. Watergate Restaurant
                                                               & Café LLC is now operating
                                                               the  Café.    This  Lorton,  VA-  Install approved devices two
         Please review our new policy                          based  LLC  is  registered  with   inches  below  the  unit  num-
                                                                                            ber on the door surround.
         before you attempt a renovation                       the  Virginia  State  Corporation
                                                               Commission  and  the  principal
         and risk additional costs or your                     operators are Suresh Spkota and Anjana Budhathoki. Chang-
                                                               es  have  started  with  increased  stock  and  additional  shelf
         project being shut down.                              space in the store section.  Over time they will refresh the
                                                               dining  area  and  move  the  coffee  machine  so  that  a  full-
                                                               service bar can open upon approval of a VA liquor license.
        in compliance with PR 96. Here are some policy highlights:   Welcome Suresh and Anjana to WAL and we look forward
          •  Applications requiring application for alterations include   to a great relationship.
            (see PR 96 for complete details and areas):
              Electrical repairs, alterations and maintenance   Annual Meeting
              Plumbing and HVAC mechanical repairs and mainte-  The  42 Annual  Meeting  of  the  Watergate  at  Landmark
                                                                      nd
              nance                                            Condominium  Unit  Owners  Association  will  be  Monday,
              Fixed  Cabinet  replacements,  wall  repairs,  structural   March  4, at  7  p.m.  This  meeting conducts annual  business

              impacts and door repairs                         and elects three board members.  Board members vote and
                                                               decide on your maintenance fees (condo fees), replacement
          •  Renovations and upgrades not requiring an application   reserve  projects,  policies,  annual  budget  items,  amenities
            include (see PR 96 for complete list):             and more for a 3-year tenure. Please vote prior to or at the
              Alterations,  remodeling  and  maintenance  by  either   Annual Meeting. Your vote can make a difference.
              unit owners or contractors that involve painting, wall-
              papering, replacing carpet with carpet           See you at the Annual Meeting!

         Page 2                                           Wheel                                         March 2019
   1   2   3   4   5   6   7