Page 3 - C21-001
P. 3
-
4
-
1:5
BEAM -SECTION
TYPICAL SLAB/UP-STAND
Conc. Trench S.F.L F.F.L work stopper bead/plaster J Casing 1:5 1 G.L. Bead Render Stop Stainless steel D.P.C 20mm Render
Foundation to S.E. Blockwork
TYPICAL EDGE SLAB-SECTION
Foundation to S.E. Blockwork S.F.L F.F.L
Structural Slab
20mm Plaster
Structural Slab 20mm Plaster work stopper bead/plaster J Casing - 2 G.L. 20mm Render Bead Render Stop Stainless steel
F.F.L
S.F.L
-
5
1:5
1:5
TYPICAL SLAB-SECTION
Concrete
D.P.C
Foundation to S.E. Blockwork
upstand
TYPICAL EDGE SLAB-SECTION
Structural Slab Foundation to S.E. beam Blockwork
Structural Slab
F.F.L
S.F.L
Bead
G.L.
-
-
6
3
Render Stop
bead/plaster
work stopper
J Casing
20mm Render
Stainless steel
1:5
1:5
TYPICAL SLAB-SECTION
D.P.C
D.P.C
Foundation to S.E. Blockwork 20mm Plaster TYPICAL EDGE SLAB-SECTION Foundation to S.E. S.F.L F.F.L Blockwork
Structural Slab ARCHITECTS LTD I P A pa ar - REVISIONS: Structural Slab NOTES: Report discrepancies to the architect. to check all dimensions on site. Do not scale from drawing. Contractor
C
Date
Cad File
Drawn by
TYPICAL
SASAKWA,
TANZANIA.
Drawing No.
20 JULY 2022
MILELE LODGE.
21TZ03/C21/011
IPA Architects Ltd
P.O.Box 3124
GRUMETI RESERVE,
F: 255 22 260502
OEM
chitect
FLOOR/BLOCKWORK
21TZ03/C21/011.dwg
AS
T: +255 22 2600503/4
s
CONNECTION DETAILS
info@ipatanzania.com
www.ipatanzania.com
PROPOSED DEVELOPMENT OF
Dar es Salaam, Tanzania
Scale (A1)
-
Rev