Water Pollution

                                                 Discharge










           1     What is the name of the      2    What are its specific objectives related to the Priority Unwanted
                 critical control for Water
                                                   Event (PUE)?
                 Pollution Discharge?
          Containment                        Efficient primary and secondary containments prevent pollution of waters


           3     What are the critical        4     What are the activities      5     What can be sampled from
                                                    within the management
                                                                                       the set of activities for
                 control performance
                 requirements to meet the           systems that support               verification, providing a
                 objectives?                        having the critical control        clear image of the critical
                                                    able to do what is required?       control status?
          Stormwater containment system in   All containment areas are regularly   Physical condition of controls through
          place, designed to handle peak daily   inspected and maintained       site observation (e.g. storm drains, storm
          rainfall averages from the past 10 years                              pits, interceptors, basins)
          (e.g. storm drain, storm pits)     Maintenance plan includes when and
                                             how stormwaters will be pumped out or   Records of containment inspections and
                                             released after rain events         maintenance records check against plans
                                                                                Record of last rain event along, check to
                                                                                see if storm waters were pumped out,
                                                                                check against written stormwater plan

          Needs for secondary containments   Materials (hazardous and non-      Record of site’s material inventory list
          are defined. Where required they are   hazardous) assessed for potential   and check requirement for secondary
          designed to hold 110% of the largest   environmental impact to waters and   containment
          container or 25% of the sum of all the   secondary containments defined  Record of preventive maintenance (PM)
          containers (whichever volume is greatest)  Secondary containments are regularly   plan to ensure secondary containments
                                             inspected and maintained including   are included in the PM schedules, check
                                             periodic water hold testing        latest water hold test
                                                                                Site walk-by observation, check condition
                                                                                of the secondary containment (e.g.
                                                                                corrosion, cracks, rainwater, debris,
                                                                                compatibility of materials)


           6     What is the target performance for critical    7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                 control?
                                                                     investigation?
          Stormwater and secondary containments maintain their   Release of pollutants either from stormwater runoff or materials
          intended use and efficiency over time                causing pollution to waters























          Creation date: 01/2022 • The latest and only controlled version of this document is available on the HSE intranet.