Water Pollution
Discharge
1 What is the name of the 2 What are its specific objectives related to the Priority Unwanted
critical control for Water
Event (PUE)?
Pollution Discharge?
Containment Efficient primary and secondary containments prevent pollution of waters
3 What are the critical 4 What are the activities 5 What can be sampled from
within the management
the set of activities for
control performance
requirements to meet the systems that support verification, providing a
objectives? having the critical control clear image of the critical
able to do what is required? control status?
Stormwater containment system in All containment areas are regularly Physical condition of controls through
place, designed to handle peak daily inspected and maintained site observation (e.g. storm drains, storm
rainfall averages from the past 10 years pits, interceptors, basins)
(e.g. storm drain, storm pits) Maintenance plan includes when and
how stormwaters will be pumped out or Records of containment inspections and
released after rain events maintenance records check against plans
Record of last rain event along, check to
see if storm waters were pumped out,
check against written stormwater plan
Needs for secondary containments Materials (hazardous and non- Record of site’s material inventory list
are defined. Where required they are hazardous) assessed for potential and check requirement for secondary
designed to hold 110% of the largest environmental impact to waters and containment
container or 25% of the sum of all the secondary containments defined Record of preventive maintenance (PM)
containers (whichever volume is greatest) Secondary containments are regularly plan to ensure secondary containments
inspected and maintained including are included in the PM schedules, check
periodic water hold testing latest water hold test
Site walk-by observation, check condition
of the secondary containment (e.g.
corrosion, cracks, rainwater, debris,
compatibility of materials)
6 What is the target performance for critical 7 What is the critical control performance
trigger for shutdown, critical control review or
control?
investigation?
Stormwater and secondary containments maintain their Release of pollutants either from stormwater runoff or materials
intended use and efficiency over time causing pollution to waters