Mobile Equipment
Incident
1 What is the name of the 2 What are its specific objectives related to the Priority Unwanted
Event (PUE)?
critical control for Mobile
Equipment Incident?
Warning Systems All vehicles onsite are clearly and easily noticeable to each other
3 What are the critical 4 What are the activities 5 What can be sampled from
within the management
control performance
the set of activities for
requirements to meet the systems that support verification, providing a
objectives? having the critical control clear image of the critical
able to do what is required? control status?
Visible and audible automatic reversing Register of mobile equipment that Review register of mobile equipment and
warning device installed on all mobile operate on site (showing presence of check the functionality of the reversing
equipment reversing warning devices on list) warning devices on site
Mobile equipment use flashing beacon Register of mobile equipment that Review register of mobile equipment
and headlights at all times operate on site. Assessment ensure all and check the vehicles being equipped
heavy mobile equipment (HME) have with the visible aids and them being
beacons and light vehicles used in areas functional
with HME are equipped with beacons
Light vehicles are fitted with flags (buggy Register of mobile equipment that Review register of mobile equipment
whips) high enough to be seen by HME operate on site. Assessment ensure all and check the vehicles being equipped
and 50mm wide strip of retro-reflective light vehicles used in areas with HME have with the visible aids and them being
material on all sides flags and refective material functional
6 What is the target performance for critical 7 What is the critical control performance
trigger for shutdown, critical control review or
control?
investigation?
Mobile Equipment is recognized by other traffic in proximity to Mobile equipment without visibility aids
the mobile equipment Mobile equipment without a working reversing warning device
Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.