invalidate any such change. In the case of a property owner’s petition to rezone
land, the petitioner shall, along with request, supply the Village with a list of the
names and addresses of all neighboring property owners within 300 feet of the
land sought to be rezoned. The petitioner shall also erect a temporary sign on each
parcel sought to be rezoned, no less than fourteen days before the public hearing
thereon, giving notice, at least, of the parcel’s current zoning, the proposed zoning,
and the date, time and location of the public hearing on the requested zoning
change. The temporary sign shall be of such size, and placed at such location, as
the Zoning Administrator determines is necessary to make the sign reasonably
visible to the public, given the subject property’s particular location and features.
To defray the Village’s costs relating to the rezoning, a petitioner shall also pay
such fee as may be set periodically be resolution of the Village Board.
(2) In case of protest against such change, signed and acknowledged by the owners of
20% or more of the areas of land included in such proposed amendment,
supplement or change or by the owners of 20% or more of the area of the land
immediately adjacent extending 100’ therefrom or by the owners of 20% or more
of the land directly opposite thereto extending 100’ from the street frontage of
such opposite land, such amendment, supplement or change shall not become
effective except by the favorable vote of ¾ of the members of the Village Board.
17.28 ENFORCEMENT.
(1) ZONING ADMINISTRATOR. The Zoning Administrator, with the aid of the
Building Inspector and Police Department, shall enforce the provisions of this
chapter.
(2) ZONING PERMIT.
(a) No building shall hereafter be erected, moved or structurally altered until a
zoning permit therefor shall have been applied for and issued. Such zoning
permit shall be displayed in a prominent location on the premises, visible
from the street, until the erection, moving or altering of such building shall
have been completed. Zoning permits shall be obtained from the Zoning
Administrator or from the Plan Commission, if the Zoning Administrator
determines that the proposed use is not clearly permitted as a matter of right
under this chapter.
(b) Applicants shall provide such information as is necessary for an evaluation
of the proposed property use under this chapter, which may include location
plans in duplicate, drawn to scale, showing the location, actual shape and
dimensions of the lot to be built upon, the exact size and location on the lot