Page 28 - Ordinance Chapter 20
P. 28

Chapter 20 - Floodplain Zoning

                         iii. Annotated FIRM panel showing the revised 1% and 0.2%
                               annual chance floodplains and floodway boundaries.

                         iv. If an annotated FIRM and/or FBFM and digital mapping data
                               (GIS or CADD) are used then all supporting documentation or
                               metadata must be included with the data submission along
                               with the Universal Transverse Mercator (UTM) projection and
                               State Plane Coordinate System in accordance with FEMA
                               mapping specifications.

                         v. The revised floodplain boundaries shall tie into the effective
                               floodplain boundaries.

                         vi. All cross sections from the effective model shall be labeled in
                               accordance with the effective map and a cross section lookup
                               table shall be included to relate to the model input numbering
                               scheme.

                         vii. Both the current and proposed floodways shall be shown on
                               the map.

                         viii. The stream centerline, or profile baseline used to measure
                               stream distances in the model shall be visible on the map.

      (d) EXPIRATION

            All permits issued under the authority of this ordinance shall expire no more
            than 180 days after issuance. The permit may be extended for a maximum of
            180 days for good and sufficient cause.

(3) CERTIFICATE OF COMPLIANCE

      No land shall be occupied or used, and no building which is hereafter constructed,
      altered, added to, modified, repaired, rebuilt or replaced shall be occupied until a
      certificate of compliance is issued by the zoning administrator, except where no
      permit is required, subject to the following provisions:

      (a) The certificate of compliance shall show that the building or premises or part
            thereof, and the proposed use, conform to the provisions of this ordinance;

      (b) Application for such certificate shall be concurrent with the application for a
            permit;

                                                                     28
   23   24   25   26   27   28   29   30   31   32   33