Detailed Design  Bioretention Raingardens                   Key design aspects for bioretention                        Permeable surfaces                                           ■   ■  edge                                     Detailed Design

                                                                                                                             Permeable surfaces enable SuDS designers
           A bioretention structure differs from a
                                                                                                                             to direct rainfall straight into a SuDS
                                                                  raingardens include;
           raingarden in that it employs an engineered
                                                                                                                                                                                          adjacent planting should include dense
                                                                                                                             structure for cleaning and storage or
           top soil and is used to manage polluted
                                                                                                                                                                                          ground cover to bind the soil in place
                                                                  1.  silt collection in forebays
           urban runoff in street locations and carparks.
                                                                                                                             infiltration into the ground.
                                                                                                                                                                                          slopes running toward permeable
           These features can contribute significantly to
                                                                  2.  space above the soil profile for water
                                                                                                                                                                                          surfaces should have a depression and
                                                                                                                             There are a number of permeable surfaces
           the urban scene so should be designed to
                                                                     collection and stilling before infiltration
                                                                                                                             available. All should have in common:
                                                                                                                                                                                          ideally an underdrain before reaching
           meet urban design standards.
                                                                     through the engineered soil
                                                                                                                                                                                          the pervious surface.
           The runoff entering bioretention features will
                                                                                                                                 the pavement surface
                                                                                                                                                                                    pavements are covered by guidance in the
                                                                     gravel protects the infiltration capacity of
           normally carry silt and pollution from vehicles        3.  a surface mulch of organic matter, grit or             1.  a pervious surface to allow water through          The design and construction of pervious
                                                                                                                             2.  an open-graded sub-base layer that
           and urban street use. Therefore, some                     the soil                                                    provides structural strength to the                SuDS Manual (Section 20) and the Interpave
           maintenance should be expected to remove                                                                              pavement with about 30% by volume                  website www.paving.org.uk
           the build-up of inorganic silt.                        4.  a free draining soil, 450 -600mm deep,
                                                                     with 20-30% organic matter cleans, stores                   available for water storage.                       There are no reported issues with surface
           The free-draining nature of engineered soils              and conveys runoff to a drainage layer                  3.  Silt washed off adjacent landscape areas           clogging under normal use. A dedicated
           leads to the washing away of nutrients from                                                                           can lead to localised surface clogging.            maintenance may be required after between
           the soil. The proportion of organic matter             5.  a transition layer of grit and/or sand                     This risk can be managed through design            10 and 20 years of use comprising a brush
                                                                     protects the under-drained drainage layer
           should be relatively high and replenished                                                                             detailing as follows:                              and suction removal of grit joints and joint
           yearly by the application of a mulch layer of             that discharges to an outfall                                  ■  slope adjacent landscape areas away          replacement.
           well composted greenwaste or shredded                  6.  a surface overflow for heavy rain or in the                   ■  use paved or turfed surfaces to
           plant matter arising from maintenance.                    event of blockage.                                             adjacent areas
  127                                                                                                                               ■  soil in adjacent planting beds should        Soft landscape areas are set below kerb level at      128

                                                                                                                                    be min. 50mm below the pavement                               this permeable paving installation.
                                                                                                                                                                                                   Almac Car Park, Limerick, Ireland.








                                                                                                                                       3


                                                                                                                                                                 1





                                            1      6                                                                                                             2
                                                              2       3


                                                                   4

                                                                            5






           Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   127   128   129   130   131   132   133   134   135   136   137