Page 61 - Updated SuDS Design & Evaluation Guide-Newham V3 Spreads
P. 61

Concept Design  Checklist for Concept Design Stage  5. Quality   Demonstrate SuDS components used in series to    Concept Design





 Design Check
 Requirement

 1. Data gathering
 To understand site constraints that inform Concept
 Information to understand site
       Confirm ‘treatment stage’
                                             mitigate ‘pollution hazard level’
 Design
 constraints including geology,
       requirements
 topography, flood risk, utilities,
 landscape context, community and
                                             amenity and biodiversity benefits
 wildlife  Confirm source control is present  Demonstrate protection of development to enable
                                             Demonstrate everyday pollution retained on site
       Confirm interception losses
 Planning requirements that influence  To be aware of planning constraints that impact
 SuDS design  SuDS design
       6. Amenity
 2. Flow route analysis  Legibility          An understanding of how the SuDS function by
 Existing flow routes  To understand site hydrology  people using or managing the site
 Modified flow routes  To understand the impact of development  Accessibility  All parts of the SuDS easily reached and safe for
                                             recreation and maintenance. Safety by design.
 3. General SuDS design elements

 Collection of runoff  Runoff retained at or near the surface
 Source control   Primary treatment stage to protect the   Multi-functionality   All parts of the SuDS landscape usable wherever
 development                                 possible
 Conveyance  At or near the surface    Visual character  All elements of the SuDS design attractive (or at
 55   Management train  SuDS components in series to manage quantity   least visually neutral, e.g. inlets, outlets, and control   56

 and quality                                 structures) and safe
 Sub-catchments   Dividing development into discreet SuDS entities
 Storage  Indicate extent and location where runoff is stored  7. Biodiversity
 Flow control  Location to demonstrate storage location
       Clean water                           ‘A controlled flow of clean water’ within and
 Outfall  Locations and method of discharge
                                             outside the site using ‘source control’ and the
                                             ‘management train’
 4. Quantity
       Connectivity                          Links to outside and within development to ensure
 Confirm interception losses will   Demonstrate the use of SuDS components that
                                             plants and animals can travel between habitat
 occur  provide interception losses
                                             areas
 Confirm how rate of flow from   Demonstrate flow rates are achievable. Increase in
       Topographical diversity               Variable vertical and horizontal structures for
 development will be reduced to   allowable discharge rates e.g. brownfield sites only
                                             complex habitat development
 greenfield runoff rates  in agreement with LPA/LLFA
       Habitat creation                      Exploit opportunities through ecological design
 Confirm how runoff will be managed  Demonstrate whether Approach 1 or Approach 2
       Sympathetic management                Create a mosaic of habitat types through
 to greenfield runoff volumes  will be used to manage volumes
                                             maintenance
 Confirm climate change allowance   Demonstrate additional volumes to be managed
 and whether urban creep is applied
 Confirm ‘long term storage’  Demonstrate no increase in runoff from pre-
 development status




 Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   56   57   58   59   60   61   62   63   64   65   66