Page 77 - Updated SuDS Design & Evaluation Guide-Newham V3 Spreads
P. 77

Detailed Design  9.3.3  Supporting information                 ■   ■  Thames Water consent to discharge to        Detailed Design

      Depending on the nature of the scheme
                                                                public sewer if sewer connection is
      various investigations, tests and calculations
                                                                required.   Refer to Thames Water advice
      may need to be performed along with
                                                                on the process required to apply for
      obtaining necessary consents:
                                                                discharge consent.
         ■
          Ground investigation, including infiltration
                                                                Proposed maintenance schedule and
          monitoring as appropriate.
                                                                all non adopted drainage.  Identify any
         ■  test results, soil testing and groundwater          confirmed management arrangements for
          Design calculations which demonstrate
                                                                proposed split of the SuDS between
          compliance with the design criteria for the
                                                                private (curtilage) and public (open space
          site including all hydraulic and structural
                                                                or highway) land.
          calculations for permeable pavements
          and underground storage structures as                 ■  Designers hazard and risk assessment- to
          appropriate.                                          consider construction, maintenance and
                                                                operation by personnel and day to day
         ■  Completion of standard design
                                                                site use by public.
          information forms as may be provided by
          the LPA.                                              ■  Details of any informative signage
                                                                proposed for SuDS.
         ■  Details of any offsite works required,

          together with any necessary consents in
          place (or can be obtained).
 71                                                                                                                72
         ■  Confirmation that discharge consents are

          in place (or can be obtained):
          Environmental Permit (Environment
          Agency) - an Environmental Permit may
          be required for works in, under, over or
          near a main river (including where the
          river is in a culvert), works on or near a
          flood defence or for works in the flood
          plain of a main river; Ordinary
          Watercourse Consent (LLFA) for any
          structure with the potential to affect flows
          in an ordinary watercourse; or highway
          drain (Highways Authority). Discussions
          should be held with EA for Infiltration
          within Source Protection Zone areas or
 Plan excerpt: proposed new Holyoaks Primary School, Redditch.  higher risk sites; Local Authority and
 The detail design stage confirms the layout, character and function of
 the SuDS, Including detailed levels, volumes, flow controls and   Inland Drainage Board byelaws,
 component design.  comments and constraints.


 Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   72   73   74   75   76   77   78   79   80   81   82