Page 58 - Bexley SuDS DESIGN & EVALUATION
P. 58

Concept Design  7.5.6  Management and maintenance           Replacement

           It is important to consider a realistic and
           appropriate level of ongoing maintenance at
                                                                  Where the design life of the SuDS
           the Concept Design stage.
                                                                  component does not surpass the design life
           SuDS features that require specialist
                                                                  of the scheme, then suitable provision must
           maintenance, hazardous waste removal or
                                                                  be made for replacement. This includes :
           replacement of component parts should be
                                                                     ■
                                                                     A methodology for how the item will be
           avoided.
           Most landscape-based SuDS treat organic
                                                                     functionality of the site.
           pollutants passively through natural                      ■  replaced whilst maintaining drainage
           processes. This approach encourages the                   Identification of how replacement will be
           continual breakdown of organic pollutants                 financed.
           throughout the design life of the SuDS.                It is noted that some SuDS components may

           Source control is critical to passive                  need some degree of rehabilitation /
           maintenance as silt, heavy metals and heavy            dedicated SuDS maintenance, for example,
           oils are trapped at the beginning of the               regritting of the joints in a permeable
           management train where they can easily be              pavement. This is not the same as
           removed and will not contaminate SuDS                  replacement, which may be required for
           features further down the train. This can              geocellular tanks amongst other items with a
           enhance amenity and biodiversity potential.            defined design life.

  53       Landscape-based SuDS techniques and
           surface conveyance ensures that ongoing                Signposts
           care can be provided as part of everyday site          NSTS 10, 11 & 12
           maintenance by landscape contractors,
           grounds or park maintenance crews,
           caretakers or even by residents themselves.

           All SuDS features, including inlets, outlets
           and control structures, must be easily                  Non-statutory Technical Standards
           accessible and able to be maintained by

           landscape care personnel.                               Sections 10, 11 & 12
           LPAs may require a Section 106 Agreement
           (Town & Country Planning Act 1990) to
           confirm that maintenance of the scheme will
           be provided on an ongoing basis. Any
           requirements for maintenance arrangements
                                                                      This fully infiltrating SuDS scheme at Burlish
           should be confirmed with the LPA on a site               School, Worcestershire, utilises the landscape
           by site basis.                                           to convey, store and infiltrate runoff requiring
                                                                             only routine landscape maintenance.


           London Borough of Bexley SuDS D & E Guide                                                        © 2018 McCloy Consulting & Robert Bray Associates
   53   54   55   56   57   58   59   60   61   62   63