Page 97 - Enfield SuDS DESIGN & EVALUATION
P. 97

Information for technical
       Parameter      Guidance on design/calculation input
                                                                             assessment
       Modelling      It is not anticipated that  SuDS design will require    The designer is to justify where
       of the SuDS    modelling of extensive piped systems. In some           no hydraulic modelling is
       layout.        instances where the scheme is relatively small and not  undertaken. Calculations/model       Detailed Design
                      hydraulically complex standard calculations will be     outputs should be provided to
                      accepted in lieu of a hydraulic model.  Layout          support the Flows and Volumes
                      drawings should be clearly labelled with the            proforma
                      numbering convention used by models.
       Outfall        Outfalls into receiving sewers or watercourses can be   Designer is to indicate whether
       design         at risk of surcharge and lack of free discharge due to   SuDS storage calculation is
                      elevated water levels. This can result in additional    likely to be influenced by high
                      storage being required.  Free discharge should not be  water levels at the point of
                      assumed. The risk of surcharge should be assessed       discharge.
                      and accounted for within calculations as appropriate.
       Long           Long sections will allow detailed consideration of      Long section showing peak
       section        levels across the site.                                 water levels.
       Erosion        Flows along swales (or other vegetated surfaces) are    Designer to demonstrate that
       check          at risk from erosion. Peak flow velocities should be    they have considered risk of
                      less than 1 - 2 l/s.                                    erosion and taken measures to
                      Concentrated inlet points are also prone to erosion.    safeguard scheme. Peak flow
                                                                              velocity calculations to be
                                                                              provided as appropriate.
       Designing      The design should incorporate overflows at each         Locations of overflows should        92
       for            SuDS component. Hydraulic calculations should           be identified on the layout
       exceedance     demonstrate that overflows have sufficient capacity to  drawing along with proposed
                      deal with anticipated flow rates. SuDS layout drawing   exceedance flow route.
                      should identify the anticipated flow route for
                      exceedance events.
       Managing       The FRA should identify the potential for flows from    The designer should
       flows from     offsite. These flows can be unpredictable and difficult   demonstrate how anticipated
       off site.      to quantify. Management of flows through the site       flows from off site will be
                      should not increase flood risk elsewhere.               managed through the site using
                      Detailed modelling to establish the rates of flow       the layout drawing and design
                      anticipated would not be considered compulsory (but     statement.
                      may be required on a case by case basis).
       Consistency  Detailed design of SuDS components should reflect         Drawings should clearly identify
       of             hydraulic calculations / hydraulic models, taking into   site levels, storage locations and
       calculations   account slopes and low lying levels.                    flow controls with cross
       and design.    The LLFA will consider design drawings to ensure that   sections and long sections. The
                      flow control sizing and storage provision is as per     design statement should
                      calculations.                                           confirm that drawings deliver
                                                                              calculated volumes.



      Enfield Council SuDS D & E Guide                                                                            © 2018 McCloy Consulting & Robert Bray Associates
   92   93   94   95   96   97   98   99   100   101   102