Page 76 - Croydon
P. 76

Detailed Design                                                                                                        9.3.3  Supporting information                             near a main river (including where the             Detailed Design

                                                                                                                             Depending on the nature of the scheme
                                                                                                                                                                                       river is in a culvert), works on or near a
                                                                                                                             various investigations, tests and calculations
                                                                                                                                                                                       flood defence or for works in the flood
                                                                                                                             may need to be performed along with
                                                                                                                                                                                       plain of a main river; Ordinary
                                                                                                                             obtaining necessary consents:
                                                                                                                                                                                       Watercourse Consent (LLFA) for any
                                                                                                                                ■
                                                                                                                                 Ground investigation, including infiltration
                                                                                                                                                                                       structure with the potential to affect flows
                                                                                                                                 monitoring as appropriate.
                                                                                                                                                                                       (Highways Authority); or with Sewerage
                                                                                                                                                                                       Undertaker for any connections to the
                                                                                                                                ■  test results, soil testing and groundwater          in an ordinary watercourse; highway drain
                                                                                                                                 Design calculations which demonstrate
                                                                                                                                 compliance with the design criteria for the           public sewer. Discussions should be held
                                                                                                                                 site including all hydraulic and structural           with EA for Infiltration within Source
                                                                                                                                 calculations for permeable pavements                  Protection Zone areas or higher risk sites;
                                                                                                                                 and underground storage structures as                 Local Authority and Inland Drainage
                                                                                                                                 appropriate.                                          Board byelaws, comments and
                                                                                                                                                                                       constraints.
                                                                                                                                ■  Completion of standard design
                                                                                                                                 information forms as may be provided by               ■  Proposed maintenance schedule and

                                                                                                                                 the LPA.                                              confirmed management arrangements for
                                                                                                                                                                                       all non adopted drainage.  Identify any
                                                                                                                                ■  Details of any offsite works required,              proposed split of the SuDS between
                                                                                                                                 together with any necessary consents in
                                                                                                                                                                                       private (curtilage) and public (open space
  71                                                                                                                             place (or can be obtained).                           or highway) land.                                  72

                                                                                                                                ■  Confirmation that discharge consents are            ■  Designers hazard and risk assessment- to
                                                                                                                                 in place (or can be obtained):
                                                                                                                                                                                       consider construction, maintenance and
                                                                                                                                 Environmental Permit (Environment                     operation by personnel and day to day
                                                                                                                                 Agency) - an Environmental Permit may
                                                                                                                                                                                       site use by public.
                                                                                                                                 be required for works in, under, over or
                                                                                                                                                                                       ■  Details of any informative signage
                                                                                                                                                                                       proposed for SuDS.















                                                 Plan excerpt: proposed new Holyoaks Primary School, Redditch.
                                           The detail design stage confirms the layout, character and function of
                                                   the SuDS, Including detailed levels, volumes, flow controls and
                                                                                               component design.


           Croydon Council SuDS D & E Guide                                                                         © 2018 McCloy Consulting & Robert Bray Associates  Croydon Council SuDS D & E Guide                                                                        © 2018 McCloy Consulting & Robert Bray Associates
   71   72   73   74   75   76   77   78   79   80   81