Page 111 - Newham SuDS DESIGN & EVALUATION GUIDE
P. 111

Detailed Design  9.7.4 Dealing with spillage    ■   ■  spillage is contained at or near the surface   9.7.5 Water quality design checklist  Information presented for   Detailed Design

 SuDS components are very effective at
 so that it is visible and accessible.
 dealing with ‘day to day’ pollution. When a
       Item
                         What is being checked
 spillage occurs this can overload the
                                                                     assessment
 slow travel time through a SuDS
 treatment processes which occur within
 management train allows time for reaction
       Method of
                                                                     Design statement to specify method of
                         Sensitivity of receptor and level of
 SuDS components.  Where the spillage is an
 and initial clean up to take place
                                                                     discharge and sensitivity of receptor.
                         treatment required
       discharge
 organic based pollutant a spill kit is used to
   ■
 mechanical mechanisms such as shut off
 take up the excess and the residual pollutants
                         site biodiversity and amenity assets and
 left in situ to breakdown naturally.
                                                                     components and management train.
 valves should be avoided due to the
                         the wider environment.
 inherent risk of the essential keys not be   Treatment   Sufficient treatment in place protecting   Layout drawing clearly indicating SuDS
                                                                     Details of Indices approach and
 Designing for spillage should demonstrate:
 locatable at the time of spillage.  An   Evidence of source control, subcatchments  infiltration screening assessment (as
 awareness of outlet locations which are   and management train.     appropriate).
 visible and can be easily sealed off will   Infiltration  Presence of SPZ’s, contaminated land,   Coordinated constraints plan. Evidence
 provide simple and robust containment.   depth to seasonal high groundwater table.  of discussion with EA where appropriate
       Construction      Demonstration of how site runoff could be  Section of the drainage design
       phase             managed during construction to minimise     statement outlining a potential approach
                         the risk of pollution to the wider          for construction runoff management.
                         environment due to silty construction       Contractors will be responsible for
                         runoff.                                     uptake.
 Milk spillages will bypass conventional drainage methods of spill containment  Operation and  Operation and maintenance should be   Concise operation and maintenance
 https://naturalresources.wales/about-us/news-and-events/news/nrw-  maintenance   simple to understand and easy to   plan. Description of tasks and detailing
 respond-to-milk-spillage-in-llantrisant/?lang=en.   plan  implement. Where available, SuDS design   of where personnel are required to visit
 105                     should deploy natural treatment process     site to remove hydrocarbon based              106
                         to breakdown organic pollutants passively.  pollutants (i.e. organic pollutants have
                         Contingency measures in the event of a      not been fully broken down passively as
                         minor / major spillage                      part of SuDS treatment process).
                                                                     Plan indicating potential for containment
                                                                     and positioning of spill kits (as
                                                                     appropriate)



























 London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates  London Borough of Newham SuDS D & E Guide                                                     © 2018 McCloy Consulting & Robert Bray Associates