Page 28 - Haringey SuDS DESIGN & EVALUATION
P. 28

Haringey have historically created and
      Local SuDS requirements
           adopted SuDs systems as a part of the Public
           Open Space or Local Highway Authority
           assets, examples can be seen throughout the
           borough and vary from ponds, to basins, to
           swales, to permeable paving.

           Adoption of SuDs


           Other than on the Council’s own Highways
           projects Haringey will not adopt SuDS.

           Applicants should therefore put in place
           arrangements for maintenance and end of life
           replacement of SuDS.  Details must be
           provided to the LLFA to add to their asset
           register.

           There are other Risk Management Authorities
           such as Thames Water or TFL who may be
           willing to consider adoption of SuDS. Early
           engagement is required to ensure their
           requirements can be achieved.


  23


































                                                                                Facing Page: Springhill Cohousing
                                                                                              Pond and Play Basin.

           London Borough of Haringey SuDS D & E Guide                                                    © 2018 McCloy Consulting & Robert Bray Associates
   23   24   25   26   27   28   29   30   31   32   33