Page 35 - Wyre DESIGN & EVALUATION
P. 35
Modified Flow Routes
key
Step 2 – Modified Flow Route analysis Holyoakes School
Proposed hard surfaces
Proposed soft surfaces
The modified flow route analysis is the basis Once the modified flow routes have
Proposed trees
for low flow conveyance through the site, demonstrated that runoff can flow
overflow arrangements and exceedance predictably through the site, the arrangement Concept Design
Proposed contours
routes when design criteria are exceeded. of runoff collection, source control, site
control, regional control, conveyance, storage
Surface ow
and final release from site can be designed.
Roof runo
Modified Flow Route
Modied ow routes Holyoakes School
Modified Flow Routes
key
Proposed hard surfaces
Proposed soft surfaces
Proposed trees
Proposed contours
Surface ow
30
Roof runo
Modied ow routes
Proposed
discharge to
existing ditch
Modified Flow Route Analysis for Holyoakes School, Robert Bray Associates.
Wyre Forest District Council SuDS D & E Guide © 2018 McCloy Consulting & Robert Bray Associates