Page 93 - Rebinded_Neat
P. 93

Detailed Design























                                                                                                                   88












                                                             Designers should provide the following:
                                                                ■  the net increase in impermeable area


                                                                ■  greenfield runoff rates are calculated
                                                                based on the area of the redevelopment
                                                                parcel and not the wider development

                                                                ■  storage requirements for additional
                                                                impermeable area based on outflow
                                                                controlled to greenfield rates for the
      Facing: The Islington, Ashby Grove Raingarden.
      A raingarden for a single property with control           development parcel.
      tube and overflow that can manage the 1 in 100
      year return period rainfall event.


      The Royal Borough of Kensington & Chelsea SuDS D & E Guide                          © 2018 McCloy Consulting & Robert Bray Associates
   88   89   90   91   92   93   94   95   96   97   98