Page 28 - Luton SuDS DESIGN & EVALUATION
P. 28

Local SuDS Specific Requirements                      Local LPA and Stakeholder Engagement
      Local SuDS requirements
           1.  As most of sites in Luton come with a             Thames Water is responsible for the surface
               long industrial heritage, land                    water network in Luton and most of the foul
               contamination would need careful                  sewers treated in East Hyde. The most north-
               consideration, especially in the town             western corner of Luton is served by the
               centre.                                           Chalton works managed by Anglian Water.
           2.  Deep bore soakaways had been accepted             The local Environment Agency office is in
               as final discharge destination, especially        Welwyn Garden City and covers the
               on sites on the peripheries of the town,          Hertfordshire and North London Area.
               without reasonable access to the surface          Developers are encouraged to contact the
               water drainage network or where                   local planning authority using the pre
               connection to the drainage network                application service to discuss potential use of
               would result in increase of flood risk            SuDS.
               elsewhere.
                                                                 Further information can be found on the
           When proposing deep bore soakaways, early             council website:
           consultation with the Environment Agency
           would be required. Also, there would be a             http://www.luton.gov.uk/Environment/
           strong expectation to:                                Planning/Planning%20applications%20
                                                                 (Building%20Control)/Pages/Environemnt-
              ■  Base the design on a commonly accepted
                                                                 agency---pre-application-advice.aspx
               design guide, such as the Kent County
               Council Soakaway Design Guide (2000)
  23          ■  Demonstrate a suitable treatment train          Adoption of SuDS
               that would warrant water quality                      ■  The Highway Authority is open to
               standards appropriate for the receiving               adoption of SuDS serving the highway
               waterbody.                                            only, in situation when the highway would
              ■  Submit assurances by a suitably qualified           be proposed for adoption.
               professional, such as a Geotechnical                  ■  The Council’s Parks department can be
               Advisor, related to the structural stability
                                                                     contacted with early enquiries and will
               and impact on the surrounding area.
                                                                     consider adoption of SuDS on a case by
           Developers should refer to the Local Flood                case basis. Commuted sums may be
           Risk Management Strategy (2015) & the draft               requested in lieu of future maintenance

           Surface Water Management Plan (2012) for                  costs.
           further information on Critical Drainage Areas
           http://www.luton.gov.uk/Environment/Lists/
           LutonDocuments/PDF/Local%20flood%20
           risk%20management%20strategy.pdf

           The Strategic Flood Risk Assessment (2013)
           could be referred to for zonal SuDS suitability
           areas.                                                               Facing Page: Springhill Cohousing
                                                                                              Pond and Play Basin.

           Luton Borough Council SuDS D & E Guide                                                              © 2018 McCloy Consulting & Robert Bray Associates
   23   24   25   26   27   28   29   30   31   32   33