Page 96 - Luton SuDS DESIGN & EVALUATION
P. 96

Detailed Design  9.5.10  Calculation checklist                              Information for technical

           Key calculation inputs and outputs should be
           presented in the ‘Flows and Volumes

           checklist’ (see appendix). The following
           checklist identifies useful calculation checks:


            Parameter
                           Guidance on design/calculation input
            Rainfall
                                                                                  Confirm the rainfall source and
                           data is used, conversion factors should be applied to
                                                                                  any conversions applied to
            data.          FEH 2013 rainfall data preferred. Where FSR rainfall   assessment
                           bring in line with FEH rainfall data.                  data.
            Areas          All area of contributing runoff should be represented   Provide a drawing clearly
            generating     within the storage calculation.                        identifying the areas of surface
            runoff         The designer must justify where a Cv of less than 0.9   runoff contribution within each
                           for impermeable area is used for calculations.         subcatchment.
                                                                                  Designer to state Cvs used and
                                                                                  justify use of Cv less than 0.9.
            Maximum        Statutory authorities e.g. LLFA, sewerage undertaker,   The flow control rate should be
            flow control   IDB or EA, might place restrictions on the outfall flow   identified along with the
            rate           rates based on the available capacity of receiving     method for defining the rate.
                           infrastructure.
            Climate        CCA has been applied within calculations based on      Designer to justify selection of
  91        change         design life of development and any applied sensitivity  CCA based on development
            allowance      assessment.                                            type and design life.
            Urban creep Urban creep allowance applied to non-adoptable            Designer to justify selection of
                           impermeable areas on developments where permitted  Urban Creep percentage
                           development is likely to occur.
            Initial        As a rule of thumb, where the area of development is   Designer to confirm whether
            interception   no greater than 4 times the SuDS wetted area, a 5mm  5mm interception losses have
            losses         allowance may be made for interception losses for      been applied in calculation.
                                  2
                           each m  of development.
            Critical       A range of rainfall durations must be considered when  Designer to demonstrate that
            duration       calculating attenuation storage.                       sufficient rainfall durations have
                                                                                  been considered to achieve
                                                                                  worst case scenario.
            Control of     Where the designer demonstrates that water can be      Designer to confirm how
            runoff         ‘lost’ or stored separately Approach 1 can be applied   volume of runoff has been
            volume         for the control of flow being discharge from the site.  controlled.










           Luton Borough Council SuDS D & E Guide                                                              © 2018 McCloy Consulting & Robert Bray Associates
   91   92   93   94   95   96   97   98   99   100   101