Page 91 - Hillingdon SuDS DESIGN & EVALUATION
P. 91

Approach 2

      Where volumes cannot be managed to

      predevelopment status, then outflow rate                                                                     Detailed Design
      should be controlled to a maximum of Qbar
      rate (which is equivalent to a 1 in 2 year or
      Qmed which is used by FEH methods) for all
      rainfall return periods up to the 1 in 100 year
      rainfall event plus climate change allowance.

      This is the approach most commonly utilised
      by industry at present due to simplicity of
      analysis, but can result in a greater storage
      requirement due to more restricted outflow
      rates. (NSTS S6)








                                                                                   Riverside Court, Stamford.
                                            Permeable pavement delivers a controlled flow of clean water to
                                                  landscape canal and rill features and to the River Welland.
                                                                                                                   86







































      London Borough of Hillingdon SuDS D & E Guide                                                  © 2018 McCloy Consulting & Robert Bray Associates
   86   87   88   89   90   91   92   93   94   95   96