COMMUNITY INFRASTRUCTURE PLAN / Community Infrastructure 2016 - 2026
Site Area
GFA
Exis ng Provision (2016)
NIL
NIL 300m2
Proposed Provision (2026)
29,000m2 (approx.) (current zone CP por on although constrained)
Es mated Capital Cost (Built Facility Only)
1. Inves gate opportunity to acquire the land from the crown with the view to providing a facility in the medium to long term.
2. Undertake targeted consulta on and associated needs analyse to determine the layout and precise func on of the space. 3. Use consulta on and needs analysis outputs to determine the need for space within the Southern Zuccoli commercial centre.
4. Consider provision op ons for a facility/s which may include a public / private partnership via an expression of interest for the facility and possible commercial opportuni es on the site.
5. Aim for delivery of the facili es in the Long term
City Centre
$472,00012
Ac on
Short Term (0-3 years)
Medium Term (3-7 years)
Long Term (7+ years)
While the current city centre popula on does not warrant the provision of space, the an cipated residen al growth within the city centre over the life of this plan will see the u lisa on of both library and recrea on centre to func on as a local facili es for future City centre residents and will be adequate in this regard.
RECOMMENDATION
UTILISATION OF EXISTING LIBRARY AND RECREATION CENTRE SPACE AS CITY CENTRE COMMUNITY SPACE IN THE MEDIUM TO LONG TERM AS THE CITY CENTRE POPULATION GROWS
44
12RAWLINSONS – AUSTRALIAN CONSTRUCTION HANDBOOK 2016 – 11.5.2 “COMMUNITY RECREATION CENTRE” – MEDIUM STANDARD (DARWIN INDEX)