SCOPE AND ADMINISTRATION




               and the fee therefor shall be one-half the amount required  [A] 106.5.3 Fee refunds. The code official shall authorize
               for  a new permit for such work,  provided that  changes  the refunding of fees as follows.
               have not been made and will not be made in the original  1. The full amount of any fee paid hereunder that was
               construction documents for such work, and provided fur-   erroneously paid or collected.
               ther that such suspension or abandonment has not
               exceeded one year.                                      2. Not more than  [SPECIFY  PERCENTAGE] percent  of
                                                                         the permit fee paid where work has not been done
               [A] 106.4.4 Extensions. A permittee holding an unexpired  under a permit issued in accordance with this code.
               permit shall have the right to apply for an extension of the
               time within which the permittee will commence work      3. Not more than  [SPECIFY  PERCENTAGE] percent  of
               under that permit where work is unable to be commenced    the plan review fee paid where an application for a
               within the time required by this section for good and satis-  permit for which a plan review fee has been paid is
               factory reasons. The code official shall extend the time for  withdrawn or canceled before any plan review effort
               action by the  permittee for a  period not exceeding 180  has been expended.
               days if  there is reasonable  cause.  A permit  shall not be  The code official shall not authorize the refunding of any
               extended more than once. The fee for an extension shall be  fee paid, except upon written application filed by the original
               one-half the amount required for a new permit for such  permittee not later than 180 days after the date of fee pay-
               work.                                              ment.
               [A]  106.4.5  Suspension  or  revocation  of  permit. The
               code official shall have the authority to suspend or revoke
               a permit issued under the provisions of this code wherever           SECTION 107
               the permit is issued in error or on the basis of incorrect,   INSPECTIONS AND TESTING
               inaccurate or incomplete information,  or  in  violation of  [A] 107.1 General. The code official is authorized to conduct
               any ordinance or regulation or any of the provisions of this  such inspections as are deemed necessary to determine com-
               code.                                              pliance with the provisions of this code. Construction or work
               [A] 106.4.6 Retention of construction documents. One  for which a permit is required shall be subject to inspection
               set of approved construction documents shall be retained  by the code official,  and such construction  or work shall
               by the code official for a period of not less than 180 days  remain  visible and able to be accessed for inspection pur-
               from date of completion of the permitted  work, or  as  poses until approved. Approval as a result of an inspection
               required by state or local laws. One set of approved con-  shall not be construed to be an approval of a violation of the
               struction documents shall be returned to the applicant, and  provisions of this code or of other ordinances of the jurisdic-
               said set shall be kept on the site of the building or job at all  tion. Inspections presuming  to give  authority  to violate or
               times during which the work authorized thereby is in prog-  cancel the provisions of this code or of other ordinances of
               ress.                                              the jurisdiction shall not be valid.
                                                                  [A] 107.2 Required inspections and testing. The code offi-
               [A]  106.4.7  Previous  approvals.  This code shall not
               require changes in the construction documents, construc-  cial, upon notification from the permit holder or the permit
               tion or designated  occupancy of a structure for which a  holder’s  agent, shall make  the  following inspections and
               lawful permit has been heretofore issued or otherwise law-  other such inspections as necessary, and shall either release
               fully authorized, and the construction of which has been  that portion  of  the construction or shall notify  the permit
               pursued in good faith within 180 days after the effective  holder or the permit holder’s agent of violations that must be
               date of this code and has not been abandoned.      corrected. The holder of the permit shall be responsible for
                                                                  the scheduling of such inspections.
               [A] 106.4.8 Posting of permit. The permit or a copy shall
               be kept on the site of the work until the completion of the  1. Underground inspection shall be made after trenches or
               project.                                                ditches are excavated and bedded, piping installed, and
                                                                       before  backfill  is put in place. Where  excavated soil
             [A] 106.5 Fees. A permit shall not be issued until the fees  contains rocks, broken concrete,  frozen chunks  and
             prescribed in Section  106.5.2 have been paid, nor shall an  other rubble that would damage or break the piping or
             amendment to a permit be released until the additional fee, if  cause corrosive action, clean backfill shall be on the job
             any, due to an increase of the mechanical system, has been  site.
             paid.
                                                                     2. Rough-in inspection shall be made after the roof, fram-
               [A] 106.5.1 Work commencing before permit issuance.     ing, fireblocking and bracing are in place and all duct-
               Any person who commences work on a mechanical sys-      ing and  other components to be concealed  are
               tem before obtaining the necessary permits shall be subject  complete, and prior to the installation of wall or ceiling
               to 100 percent of the usual permit fee in addition to the  membranes.
               required permit fees.
                                                                     3. Final inspection shall be made upon completion of the
               [A] 106.5.2 Fee schedule. The fees for mechanical work  mechanical system.
               shall be as indicated in the following schedule.
                                                                     Exception: Ground-source heat pump loop systems tested
                           [JURISDICTION TO INSERT                   in accordance with Section 1210.10 shall be permitted to
                           APPROPRIATE SCHEDULE]                     be backfilled prior to inspection.

             2018 INTERNATIONAL MECHANICAL CODE                                                                  5
  Copyrighted © 2017 by, or licensed to, ICC (ALL RIGHTS RESERVED); licensed to UL, LLC pursuant to License Agreement with ICC. No further reproductions authorized or distribution authorized.
  ANY UNAUTHROIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT; AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
   17   18   19   20   21   22   23   24   25   26   27