Page 50 - Paparan KI Sadai_Neat
P. 50

Sadai Integrated Industrial and Port, South Bangka - Indonesia
                        RATION                                                Smart Sea-Port   |   Logistics center   |   Industrial Estate
                        BANGKA
                        ABADI
                                           Area Development Strategy




         NO       Description             Industrial Area Development                           Sea-Port Development
           1            2                                3                                                  4
           1    Legal Foundation     •   Law No. 3/2014 Industry                    •   Law No. 17/2008 Shipping
                                     •   PP No 14/2015 RIPIN                        •   PP No. 61/2009 Port
                                     •   PP 142/2015 Industrial Estate              •   Permenhub Number 15/2015 Implementation of Sea Ports
                                                                                       Permenhub Number 146/2016 Amendments to 15/2015
                                                                                    •
                                     •   Permenperin No 40/216 Technical Guidelines for   •   Permenhub No 20/2017 Special Terminals and Terminals for
                                         Industrial Estate Development.                Own Interest.
                                     •   Regulations and Statutes Number 95/2015 Stan-  •   Kepmenhub No 432/2017 National Port Master Plan
                                         dard Classification of Indonesian Business Fields

           2    Institutional        In  accordance  with  the  mandate  of  the  Law  of  In-  PP Port No. 61/2009 Article 68, 69 that Concession Activities in the
                ( Business Entity    dustry No. 3/2014 Article 63 Paragraph: 3 that Devel-  port of supply and / or service of ships, passengers and goods are
                Management)          opment of Industrial Estate is carried out by Private   carried out by the Port Business Entity.
                                     Business Entities, state-owned enterprises, regionally
                                     owned enterprises, or cooperatives.
           3    Licensing            Permit for Industrial Estate Management Business Entity   Port  Business  Entity  Permit  From  the  Ministry  of  Transportation,
                                     from the Ministry of Industry.                 Investment Coordinating Board (BKPM).
                                     According to PP No. 142/2015 includes:         •   Determination of Special Terminal Locations (Feasibility Study:
                                                                                       Hydrooseanographic Survey, Topographic Survey, Zero Bench
                                     •   Location permission                           Mark (BM) Point, Planned loading and unloading volume of
                                     •   Building Permit (IMB)                         raw materials, supporting equipment, and production results,
                                     •   Document Traffic Impact Analysis.             ship  visit  frequency  plan,  economic  aspects  of  efficiency  of
                                                                                       construction of Special Terminals, environmental aspects)
                                     •   Environmental Permits                      •   Development  Permit  (Technical  Aspects  of  Special  Terminal
                                     •   Industrial Estate Business Permit (IUKI)      Master Plan, Special Terminal DED, UKL / UPL Environmental
                                                                                       Assessment, Environmental Impact Assessment).
                                                                                    •   Operational Permit
                                                                                    •   24-Hour Operational Permit



           4    Development          •   Land acquisition and land maturation.      After the Technical Aspect is fulfilled, then the construction of
                                                                                    the physical construction of the forming elements in the port area.
                                     •
                                         Infrastructure development in stages.
   45   46   47   48   49   50   51   52