Orlando International Airport BP440 North Terminal Ticket Lobby Communications
Rooms Improvements Premises Cabling Jan 2015 - April 2016
Global One Networks constructed 23 new and renovated communications rooms and
all of the associated copper and fiber backbone system for the project. Global One
Networks performed the following:
1. Preparation of shop drawings
2. Acquisition and storage of all communications equipment (value $1M)
3. Built all new communications rooms.
4. Traced and cutover Flight Information Display and paging systems.
5. Installed and Terminated several miles of ATT backbone (25, 100, and 200 pr)
6. Installed all fiber backbone cable (6 miles of fiber from 12 to 144 pair cable)
7. Provided As-built drawings to GOAA
Orlando International Airport - BP440 North Terminal Ticket Lobby Communications
Rooms Improvements CCTV Cameras January 2015 - April 2016
Global One Networks was hired by Electric Services, Inc. to install forty-
eight (48) cameras for new ticket lobby communication rooms. Each
room required an IP camera inside and outside the communication
room.
Global One Networks, performed the following:
1. Preparation of shop drawings
2. Acquisition of cameras, shrouds and brackets from the
supplier
3. Cameras given to GOAA IT Dept. for programming
4. Cameras received, and installed in shrouds and brackets.
5. Provided test images to GOAA
6. Installed CAT6 cabling and tested.
7. Submitted all images and test results to GOAA
8. Provided As-built drawings to GOAA
Orlando International Airport - Recapitalization of Pod A-Baggage System
Sept 2016 - August 2017
Global One Networks renovated 4 communications rooms and all of the associated horizontal
cable system for the project.
AIRLINE CLIENTS
• Frontier Airlines – Ongoing Vendor
• Delta Airlines – Ongoing Vendor
• United Airlines – Ongoing Vendor
• Menzies Airlines – Station Move – OIA
• British Airways – Move, Add, Change
January 2017
Global One Networks – Low Voltage Experience 3