Page 44 - Reimagine-another power is possible.cdr
P. 44
System expansion and energy which served as a basis for the DoE
efciency report. While the inverter has the
capability to switch automatically
The DoE's October 2017 inspection of between PV and genset, a manual
the system afrmed that the system intervention was set up at the request
size can cater to 319 households at 35 of BOHECO.
kWp. It also noted that the system
could provide sufcient supply for the In response, the barangay has taken
island's growing power demand for the measures to request council resolution
next two years. to extend diesel generator operations
so it can serve as a backup for the solar
However, in May 2018, just one year PV system, as needed. These
after the project was launched, the underscore the need to monitor energy
system started to overload due to sufciency, given increasing appliance
higher energy demand that came with ownership at the household level, as
the annual “homecoming” esta. well as recent computer donations to
Household surveys and key informant the schools.
engagement reect the general
community sentiment that the current Systems expansion must also be
output of the solar PV system is no considered in light of the overall vision
longer sufcient for the island's needs. to facilitate 100% renewable energy
Associated concerns include risks of transition through decentralized
damage to appliances, as well as energy systems on the island, while
reduced collection of the Pamilacan ensuring energy security amid diesel
Solar Credit Cooperative (PSSC) due displacement.
to system unreliability.
Growing the seeds of Pamilacan's clean
It is also worth noting that the energy transition also requires an
P a m i l a c a n E C A c o u n t s 3 4 6 integrated approach. Energy efciency
households as its members, 27 m u s t c o m p l e m e n t i n c r e a s e d
households more than the number renewable energy access with the goal
40