Page 7 - AsiaElec Week 26 2021
P. 7

AsiaElec                                          COAL                                              AsiaElec













                      of new green capacity undercutting coal or gas.  from coal to LNG as a transition fuel.
                         IRENA said that falling renewables costs   Even though the Chinese government,
                      meant that up to 800 GW of coal capacity could  among others in Asia, is promoting cleaner coal,
                      be replaced by renewables, saving $32bn per year  using more efficient generating technology,
                      and reducing CO2 emission by up to 3bn tonnes  emissions scrubbers and carbon capture and
                      per year (tpy).                      storage (CCUS), the report dismissed clean coal
                         IRENA director-general Francesco La Cam-  on cost grounds.
                      era said: “Today, renewables are the cheapest   Such clean coal is a risky bet, as these coal
                      source of power.”                    plants are highly unlikely to generate a return
                                                           above their cost of capital over the project
                      Post-COVID                           lifetime.
                      “Coal no longer makes sense financially or envi-  A mix of carbon pricing, lower cost renew-
                      ronmentally. Governments should now create  ables continuing to displace fossil fuels, and
                      a level playing field which allows renewables to  tight carbon budgets in the wake of net-zero
                      grow at least cost, using post-COVID stimulus  announcements leave limited potential for coal
                      spending as an opportunity to lay the founda-  to make a profit.
                      tions for a sustainable energy system,” said von   Coal is a risky and expensive proposition for
                      der Neyen.                           government and investors, and the cost of car-
                         The report also called on governments, espe-  bon is pricing coal out of the market.™
                      cially in Asia, to avoid the temptation to switch


       Elixir Energy encourages investors with




       report on Mongolia coal discovery outcomes





         MONGOLIA        ELIXIR Energy has announced exceptionally  to a new sub-basin in the PSC and has recently
                         thick total coals in the West Yangir-1 well in  begun drilling a new exploration well known as
                         Southern Mongolia, which could spark another  Kingston-1S, it added.
                         strong share price increase, Finfeed has reported.  The well has, it is said, already encountered
                           The West Yangir-1 core-hole, located approx-  coals, which is an encouraging development,
                         imately 8 kilometres west of the previous Yangir  especially given that management will be drilling
                         wells, has intersected 48 metres of coal (as meas-  numerous wells in the next months
                         ured from core by well-site geologists) to a depth   Managing director Neil Young commented
                         of 350 metres.                       on the performance of Yangir-1 and the medium
                           Mechanical challenges and down-hole cir-  to long-term exploration program, saying, “The
                         cumstances have reportedly made drilling diffi-  very thick total coals measured in the West Yan-
                         cult, and the well’s overall depth has been capped  gir-1 well have been highly encouraging, as has
                         at 350 metres.                       the discovery of coals in the drilling to date in the
                           The Manlai-1S exploratory well, located in  new Kingston location.”
                         the far northwestern corner of the PSC, suffered   Elixir’s 2021 2D seismic acquisition pro-
                         mechanical problems while drilling and could  gramme has officially completed its initial
                         not reach its intended depth, the trade title  220-km phase. An expansion of the seismic pro-
                         reported.                            gramme is being planned.™
                           The Top Diamond LLC rig has now relocated















       Week 26  30•June•2021                    www. NEWSBASE .com                                              P7
   2   3   4   5   6   7   8   9   10   11   12