Page 13 - LatAmOil Week 04 2021
P. 13

LatAmOil                                    NEWS IN BRIEF                                          LatAmOil








       SERVICES                            Bacalhau project, operated by Equinor and  gasoline and diesel. We are prepared to supply
                                           located 185 km (115 miles) off the coast of São  our full range of products and services for this
       Petrobras recognises                Paulo in Brazil. Discovered in 2012, the Bacalhau  plant,” shared Fernando Cadena, Senior Com-
                                           oilfield is located in the pre-salt area of the Santos  mercial Director at Tenaris in Mexico.
       Tenaris with supplier award         Basin at a depth of approximately 2,050 metres   provision of pipes and accessories from Tenaris’s
                                                                                  The agreement with Samsung includes the
                                           (6,725 feet).
       Petrobras has recognised Tenaris among its best   The agreement includes the provision of 75  mills in Mexico, Italy, Argentina and Romania. It
       suppliers under the “steel pipes, connection,  km of seamless pipes for risers and flowlines  also enables the company to continue supplying
       installation and maintenance” category for its  that will be manufactured at Dalmine, Tenaris’s  products for the next phases of the Dos Bocas
       collaboration in 2019.              seamless pipe mill in Italy. After production,  Refinery project.
         The award, announced in December 2020,  tubes will be mechanically lined with CRA mate-  Tenaris, January 22 2021
       distinguishes companies that have had a relevant  rial, engineered to improve corrosion resistance.
       participation in delivering products and services   The agreement also includes anticorrosive
       for Petrobras. “Each year, we recognise the com-  and thermal insulation coating for 151 km of  PERFORMANCE
       mitment of partnering companies to the pursuit  pipes to be performed at Confab, Tenaris’s pro-
       of excellence and in alignment with the values  duction facility in Pindamonhangaba, Brazil.   Petrobras discloses proved
       of our company,” said Rodrigo Ugarte, Supply  A 3LPP anticorrosive coating will be applied to
       Chain Executive Manager at Petrobras in a press  81 km, while TenCoat™️ Marine 5LPP Syntactic   reserves in 2020
       release from the company.           thermal insulation will be applied to 70 km.
         “In addition to the long-term agreements   “This project is a great example of the world-  Petrobras has disclosed its proved reserves of
       executed throughout 2019, all the contracts  class start to finish solutions Tenaris is capable  oil, condensate and natural gas, according to
       performed with Petrobras completed during  of providing to our customers. We have been  SEC (US Securities and Exchange Commission)
       2019 were crucial for winning this award, since  chosen by Subsea 7 to support them with seam-  regulation, estimated at 8.816bn barrels of oil
       on-time delivery is one of the main points con-  less pipes, coating, logistics, storage and project  equivalent (boe), as of December 31, 2020. Oil
       sidered,” said Renato Catallini, Tenaris President  management, also covering the relationship with  and condensate, and natural gas correspond to
       in Brazil.                          other suppliers,” says Renato Catallini, Tenaris  86% and 14% of this total respectively.
         During 2019, Tenaris delivered conductor  President in Brazil.           In 2020, Petrobras booked new reserves
       casing pipes with BlueDock® connectors for pre-  Tenaris, January 25 2021  related to the approval of new projects and the
       salt projects, along with Rig Direct® services,                          good performance of reservoirs, especially in
       including demand planning, rig returns and field   Tenaris and Samsung close   Santos Basin pre-salt, resulting in an appropria-
       services for offshore applications, and casings for                      tion equivalent to 101% of the year’s production.
       onshore wells.                      agreement for Dos Bocas              This effect was partially offset by the reduction of
         “It is an honor to be recognised as a partner                          oil prices by 32% in 2020, used as future prices,
       that generates real value for Petrobras. I want to   Refinery in Mexico  according to SEC regulation.
       congratulate our entire team for such an impor-                            Considering positive and negative effects on
       tant achievement,” added Catallini.  Representatives from Samsung Engineering vis-  our reserves, and disregarding the reduction due
         This is the second consecutive year that  ited Tamsa, Tenaris’s seamless mill in Veracruz,  to assets sold, the reserves replacement was 29%
       Tenaris has received the supplier recognition  Mexico, as part of an agreement for the supply  of 2020 production.
       from Petrobras, which launched the awards pro-  of coated tubes for the second phase of the Dos   Asset sales in 2020 are aligned with the max-
       gramme in 2018.                     Bocas Refinery, Mexico’s largest hydrocarbon  imisation of portfolio value, focused on world-
       Tenaris, January 18 2021            processing project.                  class deepwater and ultra-deepwater assets, and
                                              During the visit, which was carried out fol-  their impact was not relevant to the total volume
       Tenaris to supply Subsea            lowing COVID-19 protocols, representatives  of reserves.
                                                                                  The 2020 reserves still do not consider new
                                           from Samsung Engineering learned about the
       7 with coated risers and            industrial capabilities of the Tamsa mill, where  projects to be implemented as the result of the
                                           pipes and accessories for the Dos Bocas Refinery  acquisition of the Transfer of Rights Surplus.
       flowlines for Brazil’s              will be manufactured. Extensive documentation,  These volumes will be considered after signing
                                                                                the co-participation agreements for Búzios and
                                           as well as color-coded striping and special pack-
       Bacalhau offshore field             aging, were required by the customer, adding  Itapu fields.
                                                                                  The R/P ratio (ratio between proved reserves
                                           challenges throughout the manufacturing and
       Tenaris and Subsea 7 have signed an agreement  delivery process.         and production) is 9.6 years.
       for the supply of pipes and coating services for   The Dos Bocas Refinery is a project which   Petrobras historically submits at least 90% of
                                           is being developed by Pemex Transformación  its proved reserves to independent evaluation
                                           Industrial, the downstream arm of Pemex.  according to SEC definitions. Currently, this
                                           Expected to be completed in 2023, the refinery  evaluation is conducted by DeGolyer and Mac-
                                           will consist of 17 operating process plants, a  Naughton (D&M).
                                           power and auxiliary services unit, cooling tow-  Petrobras also estimates reserves according to
                                           ers and a section of water treatment plants with  the ANP/SPE (National Agency of Petroleum,
                                           a capacity of around 340,000 barrels of crude per  Natural Gas and Biofuels / Society of Petroleum
                                           day.                                 Engineers) definitions. On December 31, 2020,
                                              “This project is designed to help the coun-  proved reserves according to those definitions
                                           try achieve self-sufficiency in the production of  reached 9.427bn barrels of oil equivalent.



       Week 04   28•January•2021                www. NEWSBASE .com                                             P13
   8   9   10   11   12   13   14   15   16