Page 17 - AfrOil Week 29 2022
P. 17

AfrOil                                     NEWS IN BRIEF                                               AfrOil









       INVESTMENT
       Mozambique government

       to announce results of
       hydrocarbon licensing

       round by December

       The National Petroleum Institute (INP) of
       Mozambique is scheduled to release the results
       of the sixth hydrocarbon licensing round by
       December 2022, reports say.
         On Wednesday, July 13 Macao News cited
       INP chairperson Nazario Balangane as say-
       ing the government wants to see more invest-
       ment into the country’s hydrocarbon potential.
       According to the report, Balangane anticipates
       developing the resources will allow Mozambique
       to become a gas exporter.
         “The Pande and Temane projects are already   Turkey took the lead of destination countries  and downhole tools as well as mud and cement-
       advanced, but other opportunities arise, such as  for Egyptian natural gas from January-March,  ing services have been sourced out of the UK,
       the Petroleum sharing agreement in Inhassoro.  taking in $917mn, equivalent to a quarter of all  France, US, Canada, Egypt and the Netherlands.
       We also have Coral Sul, which is starting to come  natural gas exports. Spain came in a distant sec-  The well is anticipated to be drilled and com-
       online. We want these projects to be developed,”  ond, gobbling up $425.7mn worth of Egyptian  pleted for rigless testing between September and
       Balangane said as cited by Noticias.  natural gas, followed by Indonesia ($317.8mn)  October this year. The drilling window will be
         The round was launched in November 2022.  and France ($303.1mn).       updated as well inventory arrives in Morocco
       INP recently announced that 12 companies had   Natural gas exports represent an important  from overseas. Star Valley Rig 101 is prepared to
       pre-qualified, including China National Offshore  source of scarce foreign currency for Egypt help-  commence drilling operations on instructions
       Oil Corp. Hong Kong Holding Ltd (CNOOC),  ing to support a precarious balance of payments  from the Company.
       Sinopec International Energy Investment Ltd,  situation. Egypt became a net hydrocarbons   The geological well programme and drilling
       Eni Mozambico Spa, ExxonMobil Mozambique  exporter in 2021 thanks to surging natural gas  programme are currently being updated.
       (Offshore) Ltd, PetroChina International Iraq  prices on the global market and an uptick in sup-  Well objectives: The well will test the Mou-
       FZE and Total Energies EP New Venture.  ply following the coming onstream of Eni’s Zohr  louya Fan, previously designated the MOU-4
         With an estimated 180 trillion cubic feet (5.1  offshore giant gas field touted to be the largest  Fan. The extreme western feather edge of the
       trillion cubic metres) of recoverable gas, chiefly  discovery in the Mediterranean basin.  Moulouya Fan was penetrated in MOU-1
       in the offshore Rovuma Basin, Mozambique is   bna/IntelliNews, July 20 2022  located approximately 8 km to the southeast of
       regarded as one of the world’s most desirable                            the new step-out well. MOU-1 established the
       destinations for investment in hydrocarbon   Predator Oil & Gas Holdings   presence of gas in the target section and con-
       prospecting.                                                             firmed an over-pressured mudstone seal. Post-
         Exxon Mobil (US), Eni (Italy) and TotalEn-  issues drilling and        well seismic ties validated a seismic amplitude
       ergies (France) are among the operators of some                          signature for the MOU-4 Fan covering an area
       blocks in the basin. Eni’s $4.7bn, 3.4mn tonne   operations update       of greater than 30 square km.
       per year (tpy) Coral South floating LNG (FLNG)                             MOU-2 will test the core of the Moulouya Fan
       facility is likely to begin production soon. BP is  Predator Oil & Gas Holdings, the Jersey-based  in a shelf slope position where seismic signatures
       the exclusive off-taker of all its production.  oil and gas company with operations in Morocco,  indicate the presence of major channel systems.
       bna/IntelliNews, July 20 2022       Ireland and Trinidad is pleased to announce a  The well will provisionally be drilled to 1,500
                                           drilling and operations update.      metres TVD KB and is expected to encounter
                                              Guercif Drilling Programme, Current status:  the top of the Moulouya Fan between 1,130 and
       PERFORMANCE                         The Company is in the process of completing  1,200 metres TVD KB. At this location the well
                                           local permitting for the second of two alternative  will be targeting a gross potential Moulouya Fan
       Egypt’s natural gas exports         locations for the step-out well to the MOU-1 well  reservoir sequence of 110 metres. The potential
                                           which was completed for rigless testing in 2021.  for multiple gas-water contacts may exist as is
       quadruple in value to               The final location will be agreed following the  the case in the Anchois discovery and appraisal
                                           integration of reprocessed 2D seismic data that  wells. However, at this well location there is little
       $2.8bn in Q1-2022                   have recently been received. Civil engineering  seismic evidence for compartmentalisation of
                                           works will commence this month to construct  the target reservoir section.
       Egypt’s natural gas exports quadrupled in terms  the well pad for the step-out well now designated   The well has been designed to test an inde-
       of value to $2.8bn in the first quarter of 2022,  MOU-2.                 pendent structural closure within the Moulouya
       up from $559.9mn in the first quarter of 2021,   Long lead equipment including well heads,  Fan covering up to 11 square km., twice the area
       Amwal Al Ghad newspaper reported.   casing, cement, chemicals, drill bits mud motors  of the original Anchois discovery well.



       Week 29   20•July•2022                   www. NEWSBASE .com                                             P17
   12   13   14   15   16   17   18   19   20   21   22