Page 15 - AsianOil Week 23
P. 15

AsianOil                                    NEWS IN BRIEF                                           AsianOil







       SOUTH ASIA

       IndianOil refineries
       throughput crosses 80% as

       products demand increases

       The crude oil throughput of IndianOil
       refineries crossed 80% as on date, with   include capacity expansion at Barauni,   dispensing infrastructure across the country.
       consumption of all petroleum products   including petrochemicals complex; ethylene   PETRONET LNG, June 4, 2020
       put together almost doubling in May ‘20 as   glycol project at Paradip; expansion of
       compared to April ‘20 levels.       naphtha cracker at Panipat; and IndMax unit   EESL, GAIL sign an MoU for
         The Corporation has been able to gradually   at Bongaigaon. Work has also resumed on
       raise the throughput of its refineries from   major pipeline projects, including the Paradip-  Trigeneration projects
       about 55% of rated capacity in the beginning   Hyderabad products pipeline; augmentation
       of May ‘20 to about 78% by the month end,   of Paradip-Haldia-Durgapur LPG pipeline   GAIL (India) Limited and Energy Efficiency
       and 83% as on date. Capacity utilisation of the   and its extension to Patna and Muzaffarpur;   Services Limited (EESL) have signed a
       refineries had dropped to almost 39% in the   and the Ennore-Tiruvallur-Bangalore-  Memorandum of Understanding (MoU) today
       beginning of Apr.’20.               Pondicherry-Nagapattinam-Madurai-    in New Delhi for cooperation in development of
         With Guwahati Refinery coming online   Tuticorin R-LNG pipeline. Pipeline laying   Trigeneration projects in India.
       after maintenance shutdown, IndianOil   and other activities under city gas distribution   The MoU aims at building a closer strategic
       refineries are geared to operate at about 90%   resumed in 11 Geographical Areas. Work has   partnership between the two companies by
       of their capacities this month, as products   also restarted on other projects like grassroots   jointly exploring business opportunities in
       demand in the market increases, together with  LPG bottling plants, upcountry terminals/  Trigeneration business segment in India.
       strategic product exports.          depots and additional facilities/tankage at   Under this MOU, GAIL & EESL shall jointly
         While the consumption of all petroleum   existing bulk storage locations.  undertake studies and if found viable, 50:50
       products put together almost doubled in May   INDIANOIL, June 10, 2020   joint venture between GAIL & EESL will be
       ‘20 compared to April ‘20 levels, growth of                              incorporated for undertaking Trigeneration
       petrol was higher at about 70% and diesel   Petronet welcomes            projects. Shri Santanu Roy, Executive
       at 59%. Compared to May ‘19, or the early                                Director (Business Development & Project
       months of the current year prior to the   PNGRB’s decision on LNG        Development) signed the MoU on the behalf
       lockdown, the growth percentage has still to                             of GAIL, while Shri Amit Kumar Kaushik,
       catch up by 24% to 26% for all products. In   dispensing stations        Executive Director (Strategic Growth)
       the case of LPG, with the Corporation rolling                            inked the MoU on the behalf of EESL in the
       out about 25 lakh cylinder refills a day, the   Petroleum Natural Gas Regulatory Board   presence of Shri Manoj Jain, C&MD - GAIL
       average backlog is less than a day.  (PNGRB) in its public notice on 2nd June   and Shri Saurabh Kumar, MD - EESL through
         Along with growing consumption of white   2020 announced that any entity can set   video conference.
       oils petrol and diesel (except ATF, which is   up an LNG station in any Geographical   Trigeneration or Combined Cooling, Heat
       still lagging at about 24% of normal level), the   Area (GA) or anywhere else, even if it   and Power (CCHP) typically involves natural
       demand for black oils and specialty products   is not the authorised entity for that GA.   gas-fired generators to produce electricity.
       like fuel oil, bitumen, petcoke and sulphur has   This clarification by the PNGRB has   The waste heat from flue gas is recovered to
       also shown marked improvement, facilitating   been wholeheartedly welcomed by PLL   produce hot water / steam which in turn used
       increase of refineries throughput.  management. PLL being the pioneer and   for heating purposes and also in absorption
         With the gradual lifting in lockdown   the largest LNG infrastructure company of   chillers for cooling.
       restrictions, several downstream industries   India would like to facilitate LNG dispensing   GAIL INDIA, June 4, 2020:
       in the petrochemicals sector have resumed   infrastructure across the country on major
       operations from late April ‘20 and product   national highways and invites OMCs, CGD
       evacuation from refinery stocks has increased   entities or any interested parties to partner up   SOUTHEAST ASIA
       gradually. With increase in demand,   for this project.
       IndianOil’s Naphtha Cracker at Panipat   In these efforts, PLL has already launched   Petronas enters Myanmar’s
       is now operating at full capacity, along   its first commercially registered LNG buses
       with downstream units for production of   and LNG dispensing stations at its Dahej   gas market with first LNG
       polypropylene, HDPE, LLDPE and MEG.   and Kochi Terminals. These buses are
       The polypropylene plant at Paradip Refinery   deployed for commuting PLL employees   delivery
       has also gone online, while the PX/PTA at   between their residence and work location
       Panipat and the LAB unit at Koyali Refinery   which demonstrates the safety of LNG as an   Petronas through its subsidiary, Petronas LNG
       continued to operate during the lockdown.  automotive fuel and provides travel range   Ltd (PLL), recently completed its maiden
         IndianOil is on track to spend the   of 900 km in a single filling. PLL is already   delivery of liquefied natural gas (LNG) to
       approved capital expenditure of Rs. 26,143   developing LNG dispensing infrastructure   Yangon, Myanmar, with two LNG cargoes
       crore for 2020-21. Work on almost 250 major   along Delhi-Mumbai highway and has already   delivered in May and June 2020. The delivery
       projects has restarted on ground. Major   floated a tender. With this clarification of the   of the two LNG cargoes is part of a Master
       refinery projects on which work has resumed   PNGRB, PLL is encouraged to develop LNG   Sale and Purchase Agreement between PLL



       Week 23   11•June•2020                   www. NEWSBASE .com                                             P15
   10   11   12   13   14   15   16   17