Page 16 - GLNG Week 05 2021
P. 16

GLNG                                             EUROPE                                                GLNG


       Russia to hold Arctic field contest in March





        POLICY           RUSSIAN subsoil licensing agency Rosnedra  or Yamal peninsulas will be able to take part in
                         has announced it will stage an auction for rights  the contest, according to Rosnedra. Further-
                         to the Severo-Gydansky licence in the Russian  more, the extracted gas must be used for LNG
                         Arctic on March 24.                  production.
                           The block straddles the shore of the   Novatek has no immediate need for extra
                         Gydan Peninsula and is estimated to hold up  resources. The operator of Yamal LNG already
                         to 270bn cubic metres in possible resources.  has the gas at hand to support Arctic LNG-2,
                         But modern drilling and other explora-  Arctic LNG-1 and potentially a fourth major
                         tion work will be needed to assess reserves  liquefaction project, Arctic LNG-3. However, by
                         properly.                            securing licences now it can ensure they do not
                           Russia’s top LNG exporter Novatek had  fall into the hands of its domestic rivals Gazprom
                         requested that an auction be held for Seve-  and Rosneft.
                         ro-Gydansky in 2019. The company is seeking   Rosnedra recently said it intended to auction
                         more gas on the Gydan Peninsula to underpin  off licences for three other blocks in the Yama-
                         its future LNG projects, as it works towards its  lo-Nenets province in the second quarter, named
                         goal of producing 70mn tonnes per year (tpy)  Logasegansky, Khoshgortyegansky and Kharae-
                         of super-cooled gas by 2030. Only companies  gansky. Contests for these areas had been due to
                         that already have licences on either the Gydan  take place in 2020.™









                                                   NEWS IN BRIEF





       AFRICA                              FRU, FSU, LNGCs and ship manoeuvring   LNG Process technology, which will then be
                                           simulations. AqualisBraemar worked for   shipped to the project export terminal site
       AqualisBraemar supports             Gasfin Development and also worked   in Ensenada, Mexico. ECA LNG is a joint
                                                                                venture between Sempra LNG, IEnova and
                                           alongside civil consultancy firm AECOM.
       new floating LNG terminal at        naval architects were involved in the project   Total.
                                             AqualisBraemar’s master mariners and
                                                                                  “ECA LNG is a new customer for Air
       Tema, Ghana                         from the conception to the execution stages,   Products’ LNG business, and we are pleased
                                                                                our AP-DMR process technology was selected
                                           helping clients navigate various challenges by
       AqualisBraemar’s ports & harbour unit   providing creative and optimum solutions  to assist them in meeting their LNG business
       has successfully completed its two-year   AQUALISBRAEMAR, February 02, 2021  goals for the first phase of this strategic west
       involvement with the development of Sub-                                 coast North America LNG project. This
       Saharan Africa’s first floating LNG import                               project will showcase the innovative benefits
       terminal.                           AMERICAS                             of our technology, as it will utilize our
         The LNG terminal, located in Ghana,                                    highly efficient and cost effective dual mixed
       recently received a floating regasification   Air Products’ LNG          refrigerant (DMR) process for this unique,
       unit (FRU) that will shortly enable it to offer                          compact site location. Our recently expanded
       services to LNG carriers.           technology selected for              manufacturing facility can serve all customer
         Tema LNG Terminal Company (TLTC),                                      needs in terms of LNG production capacity
       established by Helios Investment Partners in   Energia Costa Azul export   and reinforces our commitment and presence
       November 2017 to develop, construct and                                  to serve all the LNG markets worldwide, from
       operate the Tema LNG facility at the Port of   project in Mexico         baseload mega trains to mid-scale bunkering
       Tema, recently took delivery of the FRU, built                           facilities to small-scale facilities,” said Dr.
       by Jiangnan Shipbuilding.           Air Products, the world’s leader in liquefied   Samir J. Serhan, chief operating officer at Air
         Once operational, the FRU will allow the   natural gas (LNG) technology and equipment,   Products.
       Tema LNG facility to receive, regasify, store   has signed an agreement to provide its   Air Products’ LNG equipment will be
       and deliver roughly 1.7 million tonnes of LNG   proprietary LNG technology, equipment and   able to produce approximately 3mn tonnes
       a year – equivalent to 30% of Ghana’s general   related process license and advisory services   per annum at the Ensenada location. Under
       capacity.                           to the Energia Costa Azul (ECA) LNG Export   the agreement, Air Products’ DMR process
         AqualisBraemar’s specialist ports &   Terminal Project. Air Products’ world-leading   technology, as well as engineering, design
       harbour has been involved in marine design   LNG manufacturing facility in Port Manatee,   and manufacturing of the heat exchanger
       consultancy support throughout the project,   Florida will manufacture the coil wound heat   equipment for the liquefaction section, will be
       including various mooring designs for   exchangers (CWHE) for its AP-DMRTM   supplied for the single production train. The



       P16                                      www. NEWSBASE .com                       Week 05   05•February•2021
   11   12   13   14   15   16   17   18   19