Page 13 - AsianOil Week 04 2021
P. 13

AsianOil                                    NEWS IN BRIEF                                           AsianOil





































       since last year and the growing momentum to   Horseshoe #2 was connected and   Energy’s Cooper Basin portfolio, exploration
       strengthen climate change response initiatives   commenced flowing back to the gathering   success in the Victorian Otway Basin and
       both in Japan and around the world.  network from 28 December 2020. The well   subsequent to quarter end, acquisition of
         Specifically, INPEX has set climate change   has been consistently unloading frac fluid   Mitsui’s interest in the Bass Basin.
       response goals to achieve its own net zero   unassisted over the course of January at a gas   Production of 6.2 MMboe was down 8%
       carbon emissions by 2050. The company   rate of 160 mscfd + condensate. It is suspected   below the prior quarter and 3% below the
       will also actively promote the following five   that the lower pressured Intra Wallabella zone   prior corresponding period, a result impacted
       business pillars by making full use of the   is yet to contribute while the higher pressured   by the Otway Gas Plant maintenance
       technologies, assets and human resources the   Rewan formation continues to slowly unload   shutdown in November, with this also
       company has nurtured until now through   frac fluid.                     affecting sales revenue, which was down 5%.
       the development of crude oil and natural gas,   Warroon #1 continues to consistently   Beach Energy Managing Director, Matt
       and leveraging these strengths to grow the   produce from the Rewan formation at around   Kay, said that he was proud of how the Beach
       five business pillars to have sufficient earning   400 mscfd. The well continues to additionally   team closed out the 2020 calendar year – in
       power looking ahead towards 2050: Reduce   free flow condensate at approximately 15   particular, the achievement of a new safety
       CO2 emissions from upstream operations   bbls/d. The Showgrounds formation remains   record during the quarter, with over one
       (Promotion of CCUS); Develop a hydrogen   isolated while the company continues to   million hours worked without a recordable
       business; Enhance and emphasize renewable   evaluate the reservoir performance of the   injury.
       energy initiatives; Promote carbon recycling   Rewan.                      “In what was a very active quarter for
       and cultivate new business opportunities;   While Armour remains encouraged with   Beach, I am proud of the efforts from our
       Promote CO2 absorption through forest   the stimulation execution and reservoir   team to stay safe in what we all know was an
       conservation                        response, the well clean up period is taking   extremely disruptive year,” Mr Kay said.
       INPEX, January 27, 2021             longer than anticipated. A remedial frac   “The achievement of FID on Waitsia Stage
                                           treatment for all three wells is currently   2 just before Christmas was a significant
                                           planned for the first week of February. The   milestone, as it makes Beach Australia’s
       OCEANIA                             aim of this treatment is to accelerate the   newest player in the global LNG market. We
                                           recovery of frac fluids by dissolving any   are very excited to be working with our JV
       Armour provides Surat               residual hydrated polymers from the frac fluid   partner in expanding the development of the
                                                                                Perth Basin.
                                           allowing the reservoir greater connectivity
       update                              to the well bore. The effectiveness of this   LNG at an opportune time, where customers
                                                                                  “Beach expects to commence marketing of
                                           treatment should be known within 7 to 14
       The Board of Armour Energy is pleased to   days following the application.  are likely to value reliable supply from high
       provide an update on the Surat 2020 Work   ARMOUR ENERGY, January 27, 2021  quality de-risked projects, as north Asia
       Programme which is being conducted on                                    markets experience supply constraints during
       Armour’s 100% owned and operated Kincora   Beach posts quarterly         the current northern winter season.
       Gas Project.                                                               “On the exploration front, we were thrilled
         Horseshoe #4 was connected to the   results                            with the gas discovery at our Enterprise
       gathering network on 23 December 2020. Gas                               onshore-to-offshore well. The discovery de-
       rates have steadily increased to 260 mscfd over  Beach Energy today released its second   risks additional prospects in the vicinity of
       the course of January as the well continues   quarter activities report, headlined by the   Enterprise and, with only the first exploration
       to slowly recover frac fluids from the Basal   company reaching Final Investment Decision   well in the campaign, meets the Otway
       Rewan.                              on Waitsia Stage 2, the acquisition of Senex   exploration success assumed under the



       Week 04   28•January•2021                www. NEWSBASE .com                                             P13
   8   9   10   11   12   13   14   15