Page 10 - GLNG Week 48 2021
P. 10

GLNG                                         NEWS IN BRIEF                                             GLNG








                                                                                Company and KTZ intend to enter into a
                                                                                long-term agreement for Condor to produce
                                                                                and supply LNG to KTZ as a fuel for the
                                                                                national freight locomotive fleet.
                                                                                  KTZ operates a rail network of
                                                                                approximately 15,000 km and a fleet of
                                                                                more than 700 mainline freight locomotives.
                                                                                It is expected that the conversion of
                                                                                the locomotive fleet to LNG fuel will
                                                                                materially reduce operating costs, increase
                                                                                transportation speeds, reduce CO2
                                                                                emissions and other particulates, and reduce
       and sequestration allow our state to sustain   Bay Shipbuilding.         dependence on diesel fuel imports.
       industry without sacrificing our long-term   “This repeat order comes based on the   This project has the potential for the
       carbon-reduction goals.”            success of the first vessel’s cargo handling   Company to become the largest producer
       VENTURE GLOBAL LNG, December 02, 2021  project, and Wärtsilä’s unmatched reputation   and supplier of LNG in Central Asia, while
                                           for high quality LNG system solutions.   materially contributing to the Republic of
       Wärtsilä wins order to              The North American maritime sector is   Kazakhstan’s national initiative to decarbonise
                                                                                its transportation sector and achieve carbon
                                           increasingly turning to LNG fuel as a means
       supply Cargo Handling               to reduce its carbon footprint, and this   neutrality by 2060. Condor is targeting to
                                                                                construct multiple modular LNG facilities,
                                           project represents an important addition
       System for second LNG               to the supply infrastructure. Our depth of   each with the initial production capacity
                                           experience certainly adds significant support
                                                                                of 125,000 gallons of LNG per day and
       Bunker Vessel being                 to this trend,” says Kjell Ove Ulstein, sales and   expandable as the LNG market demand
                                                                                increases for buses, long-haul transport trucks
                                           marketing director for Wärtsilä Gas Solutions.
       built by Fincantieri Bay            cubic metre insulated LNG cargo tanks, the   and mining equipment.
                                              The Wärtsilä scope includes four 1350
                                                                                  This project is being implemented through
       Shipbuilding                        cargo control system, deepwell pumps, a ship-  a joint task force of Condor, KTZ and JSC
                                                                                KazTransGas (the national gas company
                                           to-shore transfer system, a nitrogen generator,
       The technology group Wärtsilä will supply a   all necessary safety equipment and systems, a   of the Republic of Kazakhstan) and their
       new 103 metre (340 feet) long LNG Bunker   custody transfer measurement system, and the  subsidiaries.
       Barge with a complete LNG cargo storage   gas combustion unit. Deliveries to the yard   CONDOR PETROLEUM, November 30, 2021
       and handling system. The ship will be built   will commence in November 2022.
       at Fincantieri Bay Shipbuilding (FBS) in   The two barges will be capable of delivering   SLNG and Linde to jointly
       Wisconsin, USA for Polaris New Energy   fuel to both ocean-going and inland waterway
       (PNE). This is the second of two such barges   vessels operating on LNG.  explore carbon dioxide
       built at the yard for PNE, the same Wärtsilä   WÄRTSILÄ, December 01, 2021
       solution having been ordered for both. The                               liquefaction and storage
       first barge is scheduled for delivery from FBS
       in December 2021. This latest order with   ASIA                          facility in Singapore
       Wärtsilä was placed in November 2021.
         In addition to the equipment scope,   Condor announces signing         Singapore LNG (SLNG) and Linde Gas
       Wärtsilä will also provide the detailed                                  Singapore have signed a memorandum of
       design for the system as well as all necessary   a co-operation agreement   understanding (MoU) to collaboratively
       integration requirements. The second barge                               explore the feasibility and development of
       will be able to load LNG from the major   with Kazakhstan’s national     a carbon dioxide (CO2) liquefaction and
       terminals thanks to an elevated manifold                                 storage facility, located adjacent to the SLNG
       feature. Wärtsilä’s leading position as a   railroad operator            terminal on Jurong Island.
       provider of LNG systems for the marine sector                              Broadly, the project concept involves
       enables the company to offer solid support   Condor Petroleum is pleased to announce   using cold energy from the SLNG terminal’s
       for owners and operators as the acceptance of   continued progress in its strategy to   operations to liquefy CO2, leveraging on
       LNG fuel continues to grow.         implement proven North American modular   Linde’s and SLNG’s combined expertise
         “When delivered, these two barges will   liquefied natural gas (LNG) technologies and   in carbon capture, liquefaction, as well as
       be the largest LNG bunker barges in the   processes to produce Central Asia’s first LNG.  cryogenic storage and handling solutions.
       US, which further solidifies Fincantieri   The company has signed a co-operation   The liquefied CO2 (LCO2) will be stored in
       Bay Shipbuilding’s reputation as the ‘go-to’   agreement with the Kazakhstan national   tanks onsite before it is eventually transported
       shipyard for LNG bunker vessels. We are very   railroad operator, JSC NC Kazakhstan Temir   for end use. If feasible, this could be the first
       pleased to once again partner with Wärtsilä   Zholy (KTZ) for the implementation of a   such facility of its kind in Singapore and the
       for this second PNE barge, and we thank   project to convert Kazakhstan’s national   Region, where existing cold energy from
       them for the excellent way in which the first   freight locomotive fleet to LNG fuel. A field   SLNG is utilised to liquefy CO2, thereby
       vessel project was executed,” says Justin Slater,   demonstration project will first be conducted   directly capturing CO? which may otherwise
       director of sales and marketing at Fincantieri   and upon satisfactory results thereof the   be emitted into the atmosphere.



       P10                                      www. NEWSBASE .com                      Week 48   03•December•2021
   5   6   7   8   9   10   11   12   13