Page 13 - AsiaElec Week 46
P. 13

AsiaElec                                   NEWS IN BRIEF                                            AsiaElec







       revealed the nation had added 18.7 GW of   Renewable Energy Outlook envisages 119   The third phase will focus on developing
       solar to the end of September.      GW of new solar per year to 2030 and 150   the renewable energy sector as well as
         Trade body the China Photovoltaic   GW annually during 2031-35.        further sustainable and cost-effective energy
       Industry Association has denied a report it                              production.
       has revised down its expectations for the year                             Siemens Energy will also collaborate
       from 35-45 GW to 35-40 GW, although the                                  with the government to develop training
       AECEA expectation ties in with the lower   RENEWABLES                    and vocational programmes for the people
       figure. The NEA said 10.04 GW of the new                                 of Afghanistan, supporting the creation of a
       capacity came in the form of utility scale   Siemens Energy to build     skilled and competitive local workforce for the
       projects, with residential arrays amounting                              development of infrastructure and industries.
       to 5.27 GW and commercial and industrial   Afghan energy hub               Currently, parts of Afghanistan’s electricity
       systems contributing 3.39 GW.                                            grid network are fragmented and supplied
         With preparations well under way for   Siemens Energy has signed a multi-phase   as passive islands with power fed from
       China’s next five-year plan – which the   agreement with Afghanistan to establish the   neighbouring countries.
       AECEA expects to be unveiled in March – the   country as an energy hub in central Asia   Only around 28% of the 37 million people
       analyst has speculated three important clean   by developing a modern, sustainable and   living in the country have access to electricity.
       energy targets could be revised. With the   cost-effective power system that incorporates   Siemens Energy chief executive Christian
       nation aiming for 20% of its primary energy   renewable energy generation.  Bruch said: “The development of this plan will
       consumption to come from renewables by   The agreement builds on a memorandum   provide long lasting benefits in Afghanistan
       2030, and having already reached 15.3% last   of understanding that Siemens signed with   which will be felt for generations to come.
       year, officials could add a 2025 target of 18-  the government of Afghanistan in January   “The electrification of Afghanistan will be
       19%, according to the analyst.      2019, to support the country’s sustainable   done sustainably and efficiently, turning the
         Clean energy supplied 28% of total   development.                      nation into a beacon for energy advancement
       generation last year, and could be the subject   The three-phased plan will see Siemens   and transforming the country into a regional
       of a new, 32% target for 2025; and non-hydro   Energy support Afghanistan’s power sector by   energy hub.
       renewables, which generated 10.2% of China’s   developing a reliable and affordable electricity   “This project is symbolic of Siemens
       electricity last year, could be set an 18.9%   supply, while addressing the efficient use of   Energy’s goals; to take a holistic approach
       ambition for 2025.                  natural resources, to improve revenue streams   to energising society, in an efficient, cost-
         The AECEA reports various institutions   back to the government.       effective and decarbonizing way.”
       have been tasked with estimating how much   The first phase will focus on establishing
       extra solar would be required annually to hit   the commercial and technical feasibility, with
       such targets, with estimates ranging from 47-  the second stage addressing grid expansion
       64 GW, and even as high as 81 GW per year.   and stabilisation by completing a national
       Such returns could see China hosting 480-560   grid with international connections and the
       GW of solar by 2025, or even as much as 645   formation of local generation hubs utilising
       GW. Beyond that point, the current China   renewable energy.








































       Week 46   18•November•2020               www. NEWSBASE .com                                             P13
   8   9   10   11   12   13   14