Page 12 - AfrElec Week 21 2021
P. 12

AfrElec                                     NEWS IN BRIEF                                             AfrElec








       SOL AR                              and reliable energy for Malawi and to other   KenGen will drill a total of three
                                           developing nations. “We are pleased to have   geothermal wells that will produce an overall
       Malawi’s first utility-scale        selected Sungrow to supply solar inverters,   power of 15 MWe in this particular field. The
                                                                                wells are a part of a pilot project with which
                                           transformer kiosks and a one-stop lithium-
       solar-plus-storage project          ion battery energy storage solution for this   the authorities of this East African country
                                           pioneering project,” he said.
                                                                                aim to test the geothermal potential of the
       to be built in Golomoti             Southern Africa mentioned that the   Lake Assal region.
                                             Phyllis Yang, the head of Sungrow
                                                                                  The project is subsidised by the Kuwait
       Renewable energy company, Sungrow has   introduction of Sungrow’s latest outdoor   Fund for Arab Economic Development
       partnered with JCM Power, InfraCo Africa,   Power Conversion System solutions to the   (KFAED) together with the Arab Fund for
       RINA and Innovate UK to construct Malawi’s   African market will boost the region’s clean-  Economic and Social Development (Fades).
       first utility-scale solar-plus-storage project.   power access and economic growth. “We   Following the completion of the said pilot
         Located in the Dedza district of Malawi   are extremely proud to be part of this iconic   project, the Djibouti government plans to
       near the town of Golomoti, the 20MWac solar   project,” she added.       entrust the development of the geothermal
       PV and 5MW/10MWh energy storage project   JCM POWER                      programme in the Lake Assal region to
       is set to become a leading project in sub-                               Independent Power Producers (IPP).
       Saharan Africa in showing the value of solar                               The development of this programme is
       PV together with energy storage.    GEOTHERMAL                           supported by the African Development Bank
         The project is expected to fully adopt                                 (AfDB) through a $24.73mn loan so far.
       Sungrow’s one-stop solar-plus-storage MV   Drilling works at Galla Le    Back in July 2013, the pan-African bank lent
       solution comprised of PV inverter, MV                                    Djibouti $6.83mn , followed by $14.68mn in
       station, all-in-one Power Conversion System,   Koma geothermal field to   2016 and $3.22mn last year.
       battery container, and energy management                                   As well as Lake Assal, Lake Abbe is
       system (EMS). Sungrow’s PV and storage   begin                           another promising region as far as geothermal
       technologies will be deployed to improve                                 development is concerned.
       the availability, reliability, and quality of the   Kenya Electricity Generating Company   According to ODDEG, the two geothermal
       Malawi power supply through its capabilities   (KenGen), a parastatal company and the   sites have a combined potential of 5,000
       in providing frequency regulation, voltage   largest electric power producer in Kenya has   MWe, the exploitation of which would propel
       regulation, peak shaving, and reactive power   revealed that preparations are 80% complete   the East African country to the forefront of
       support.                            and that the actual drilling works at the Galla   renewable energy-producing countries in the
         The Golomoti project will have all   Le Koma geothermal site located in Lake Assal  continent.
       engineering, procurement and construction   region, central Djibouti, shall commence in
       activities managed by JCM Power. The   June.
       inclusion of lithium-ion batteries behind   This comes approximately three months
       the meter at this scale will be a first in sub-  since the Nairobi, Kenya-based Company   HYDRO
       Saharan Africa. The project is expected to   signed $6.5m contracts with Office Djiboutien
       enter operations at the end of 2021,  de developpement de l’energie geothermique   Sunon Asogli to enter
         According to Shane Eglinton, Engineering   (ODDEG), or rather the Djiboutian office of
       Director of JCM Power, the project will   geothermal energy development), to carry out   Liberia’s power industry
       demonstrate the pathway for clean, affordable   the project.

































       P12                                      www. NEWSBASE .com                           Week 21   27•May•2021
   7   8   9   10   11   12   13   14   15   16