Page 14 - AsiaElec Week 12 2021
P. 14

AsiaElec                                     NEWS IN BRIEF                                           AsiaElec








                                                                                which it is moving into the next phase of its
                                                                                development by embracing businesses that
                                                                                complement its three core property businesses
                                                                                that are comprised of commercial property,
                                                                                residential property, and resorts and hotels.
                                                                                  “We want a business that can become
                                                                                huge, combining steady, consistent returns
                                                                                with exciting growth opportunities. We will
                                                                                leverage the synergies between our four
                                                                                business platforms to give us great competitive
                                                                                strength,” Mr. Bhirombhakdi said.

       (CGN) and China Datang, are pushing a   last year to power its fast growing economy,
       similar agenda.                     according to the plan.
                                                                                VIRTUAL POWER PL ANTS
                                                                                Tesla launches virtual
       GAS-FIRED GENERATION                GENERATION
       VinaCapital, GS Energy to           Singha Estate secures                power plant in Australia
                                                                                Tesla has launched a new “Tesla Energy Plan”
       invest $3bn in LNG power            rights in 3 major power              in South Australia to try to lower electricity
                                                                                rates in a region notorious for high energy
       plants in Vietnam                   plants                               costs.
                                                                                  The plan is backed by a Tesla Powerwall-
       VinaCapital, one of the largest investment and   Singha Estate Plc, a leading Thai property   powered virtual power plant.
       asset management firms in Vietnam, said on   investment and development company, today,   South Australia have had a lot of power
       Monday it would jointly invest up to $3bn in   announced that it has secured the exclusive   issues over the years.
       a LNG-to-power complex in the country with   rights to acquire a 30% shareholding in three   Tesla first got involved by supplying its
       its South Korean strategic partner GS Energy.  major co-generation power plants with total   Powerpack in a large energy storage project
         The first phase of the 3,000-megawatt   capacity of 400 megawatts, at par value, and   owned by Neoen that became known as the
       complex in the southern province of Long   with a total investment of Bht 1,392mn.  “Tesla Big Battery.”
       An should be operational from the end of   The first of the plants is an operational   While in the region during the launch of
       2025, VinaCapital said in a statement, Reuters   123MW combined cycle co-generation power   the big battery, Tesla CEO Elon Musk was
       reported..                          plant that is owned and operated by Angthong  interviewed and presented with the significant
         The company did not specify when it   Power Company Limited and located in the   hardship that Australia’s high electricity prices
       would start building the complex, noting   ‘World Food Valley’ industrial estate in Ang   are putting on low-income families.
       pending regulatory approvals were required.  Thong, Central Thailand.      The unstable grid and high electricity
         It said the US, as a major producer of LNG,   The second and third plants, each with   costs result in some families having to decide
       would be one “likely source” of LNG for the   140 MW capacity, are greenfield operations   between keeping the lights on or going
       complex.                            that are currently under construction and   hungry.
         LNG is growing more popular as a power   will enter into service in 2023. They are also   Musk was visibly emotionally affected by
       generation fuel in Vietnam as coal falls out of   located in the ‘World Food Valley’ industrial   the issue and vowed that Tesla would “work
       favour because of its emissions and climate   estate. The licences for these power plants are   harder” to help solve the problem.
       impact, with the country ramping up plans for   owned by B.Grimm Power (Ratchaburi) 1   He wasn’t kidding because a few months
       LNG import terminals and power plants.  Limited and B.Grimm Power (Ratchaburi) 2   later, Tesla announced that it reached a deal
         Prime Minister Nguyen Xuan Phuc   Limited.                             with the South Australian government to
       welcomed GS Energy’s investment in     The three acquisitions are subject to Singha   install solar arrays and Powerwalls on up to
       the province as he visited the site of the   Estate’s shareholders’ approval at its Annual   50,000 homes – many of them homes of low-
       planned complex in Long An on Sunday, the   General Meeting on 23 April 2021.  income families.
       government said.                       Chutinant Bhirombhakdi, Chairman of   Over the last few years, Tesla has been
         Vietnam plans to raise the proportion of   the Board of Directors of Singha Estate Plc,   deploying more Powerwalls to grow the
       gas-fired electricity in its power mix to 21% by   said, “We have secured these rights under   virtual power plant, which provides grid
       2030 and to 24% by 2045 from 13% currently,   very attractive terms. They are an important   services to reduce cost and backup power in
       according to a draft of the government’s   part of the jigsaw that will make Singha Estate   case of a power outage.
       master power development plan expected to   into one of Thailand’s foremost property,   Last summer, Tesla had 1,000 Powerwalls
       be officially released later this year.  power generation, and engineering services   on the network, and they were authorised for
         The country required up to $128.3bn of   companies, while tripling the size of our   a new phase to add another 3,000 batteries.
       investment in its electricity industry during   business to Bht 20,000mn in revenues in three   Now, Tesla is launching what it calls the
       the 2021-2030 period to raise its total installed   years.”              “Tesla Energy Plan on the Tesla Virtual Power
       power generation capacity to 137.2 gigawatt   Singha Estate recently announced that   Plant.”
       (GW) by 2030 from 69 GW at the end of   2021 is a transition year for the company in



       P14                                      www. NEWSBASE .com                          Week 12 •24 March•2021
   9   10   11   12   13   14   15