Page 11 - AsiaElec Week 50 2020
P. 11

AsiaElec                                    NEWS IN BRIEF                                           AsiaElec








                                                                                other blocks in Tampines over the next two
                                                                                months under the pilot, which will last about
                                                                                six months.




                                                                                RENEWABLES
                                                                                China commits to 1,200GW

                                                                                of wind and solar by 2030

       COAL                                blocks include Adani Enterprises, Vedanta,   China will boost its installed capacity of wind
                                           Hindalco Industries and Jindal Power.  and solar power to more than 1,200 GW by
       India approves bids for four                                             2030, and increase the share of non-fossil fuels
                                                                                in primary energy consumption to around
       coal blocks                         RENEWABLES                           25% during the same period, President Xi
                                                                                Jinping said on Saturday.
       The Indian coal ministry has again invited                                  “Today, I wish to announce some further
       bids for four coal blocks whose tender process   Eco boards to track utilities   commitments for 2030,” Xi told a one-day
       was annulled in the first round of auction                               virtual U.N. climate change summit via video,
       for commercial mining, as the number of   usage at five blocks in        before announcing the targets.
       technically qualified bidder for each mine was                             “China always honours its commitments.”
       just one.                           Singapore                              He also said china would reduce carbon
         Of the four coal blocks, three are in Odisha                           intensity by over 65% by 2030 (compared to
       and one is in Jharkhand.            Residents from about 633 households staying   its initial commitment of 60-65%). it was at
         “The nominated authority conducted the   in five Housing Board blocks in Tampines can   48.1% at the end of 2019;
       first attempt of 11th tranche of auction under   now track their blocks’ utilities usage at “eco   Beijing also plans to increase non-fossil
       CM(SP) Act and 1st tranche of auction under   boards” installed at their lift lobbies under a   energy to around 25% by 2030 (compared to
       the MMDR Act of identified coal mines/   pilot programme.                20% in their current target). It was at 15.3% at
       blocks vide tender document dated June   The digital boards provide real-time   the end of 2019;
       18, 2020,” the coal ministry said in a notice   figures of the block’s aggregated water and   It aims to increase forest stock volume to
       inviting tender.                    electricity consumption and the resulting   6bcm by 2030 (compared to 4.5bcm in their
         It added that as the number of technically   carbon emissions generated over the previous   current target). It was approximately 4.5bcm
       qualified bidders for the tender was less   24 hours.                    at the end of 2019.
       than 2 for Chendipada, Chendipada-II and   They also offer residents tips on lowering
       Kuraloi (A) North coal mines in Odisha and   their utilities consumption and will let them
       Seregarha block in Jharkhand, the process was   take part in energy-saving challenges through
       annulled.                           competitions with other blocks.      HYDRO
         The blocks, which are fully explored, have   Speaking at the launch event yesterday
       an annual peak-rated capacity of 52mn tonnes   morning at Block 878A in Tampines   Thai government threaten
       (MT).                               Avenue 8, Minister for Social and Family
         “The nominated authority is initiating the   Development Masagos Zulkifli said the   to boycott new Lao hydro
       second attempt of auction of these coal mines   eco boards are part of the Tampines Town
       with the same terms and conditions as in the   Council’s effort to make the estate Singapore’s   electric dam project
       first annulled attempt of auction,” the ministry   first “eco town”.
       said.                                  Mr Masagos, who is the MP for the   Laos officials have announced the
         The auction of blocks for commercial   Tampines West ward of Tampines GRC, noted   announcement of yet another Laos hydro
       mining has opened India’s coal sector to   that Singapore is aiming to reduce the amount   electric dam and Thai authorities aren’t
       private players.                    of water used by households to 130 litres per   happy. The long list of Laos and Chinese
         The first-ever auction of coal mines   person daily by 2030, down from the current   dams along the Mekong River have hugely
       for commercial mining witnessed “fierce   amount of about 140 litres daily.  affected the life of communities downstream
       competition”.                          “To get there, there are a lot of things   of the Mekong in Thailand, Cambodia and
         Earlier, Coal Minister Pralhad Joshi said 19   that need to be done. First, we need to get   Vietnam. And Laos. The Lao PDR has been
       auctioned mines will generate total revenues   information to our residents for them to know   described as South East Asia’s ‘battery’ and has
       of around ?7,000 crore per annum and   how they compare with others in terms of   been building hydro electric dams at speed
       create more than 69,000 jobs once they are   usage and what they can do to reduce their   in recent decades, sometimes with disastrous
       operationalised.                    water usage over time.”              consequences.
         In June, Prime Minister Narendra Modi   Three other Tampines GRC MPs - Ms   They’ve question the potential
       launched the auction process for 41 coal   Cheng Li Hui, Mr Desmond Choo and Mr   environmental impact of the planned
       blocks for commercial mining. Some of the   Baey Yam Keng - also attended the launch.  Sanakham hydroelectric dam in Laos between
       large corporate groups that have bagged   More eco boards will be installed at five   Xayaburi and Vientiane, and say they could



       Week 50   16•December•2020               www. NEWSBASE .com                                             P11
   6   7   8   9   10   11   12   13