Page 19 - AsianOil Week 38
P. 19

AsianOil                                    NEWS IN BRIEF                                           AsianOil







       of appraisal and development. These new   protect the health and safety of communities   gas market. Being contiguous to PL231, Block
       blocks in conjunction with Mahalo North   across the Northern Territory.  5 covers 1,414 km2, an area eight times larger
       (ATP 2048) provide a substantial area for gas   The Kyalla well, successfully drilled in   than PL231 (174 square km). The Rolleston-
       development, as an extension of the main gas   January, will now be fracture stimulated   West project contains highly prospective
       fairway at the advanced Mahalo Gas Project.  followed by a period of production testing   targets for both coal seam gas (CSG) and
         Timing of award coincides with the   over the coming months. Initial results from   known conventional gas within the permit
       Federal Government push to fast track gas   this are expected by the end of the year, with   area.
       development, with the Mahalo Gas Hub   full results in the first quarter of 2021.  The Bandanna coal measures, a proven
       emerging as a prime candidate to deliver gas   Origin General Manager for Beetaloo and   resource for CSG in the region, are extensive
       for supply to the domestic market.  Growth Assets, Tracey Boyes, said, “Origin is   across Block 5. The Block also contains the
         PLR2020-1-1 (which will be called   pleased to be resuming exploration activity   extension of the Reid’s Dome Beds which the
       Mahalo East) covers an area of 97 km2 and   in line with the Northern Territory’s strict   company is currently appraising in PL231,
       is located immediately east of Mahalo North  regulations to protect the environment and   and several promising conventional targets
       (and north of the Mahalo Gas Project) in   groundwater.                  identified by historical seismic and drilling.
       the same high-quality gas fairway. Similar   “We have a robust COVID management   Rolleston-West, like PL231 (Reid’s Dome),
       to Comet Ridge’s 100% owned Mahalo   plan and additional controls in place so we   is not constrained by a domestic market
       North project, Mahalo East is considered   can continue to safely carry out our work.  supply condition; gas produced from the
       an immediate extension of the Mahalo Gas   “Our Beetaloo project is already creating   Block may be sold to any market, providing
       Project.                            local jobs and opportunities and if successful,   further flexibility for State Gas.
         PLR2020-1-2 (which will be called Mahalo   has the potential to deliver long term   Being contiguous with PL231, the
       Far East) covers an area of 338 km2 and is   economic benefits for the Northern Territory   addition of Rolleston-West will create a
       located slightly further east again. This block   and Australia,” Ms Boyes said.  super-gas region and enable the Company to
       is interpreted to contain the north-eastern   ORIGIN, September 21, 2020  integrate activities and undertake a unified
       extent of the high-quality gas fairway and                               development across both areas. Facilities and
       to have a very large gas in place volume,   State Gas wins contiguous    infrastructure can be shared and optimally
       providing significant potential upside within                            located and economies of scale can be
       the Mahalo Gas Hub.                 new acreage                          obtained.
       COMET RIDGE, September 21, 2020                                            Gas from Rolleston-West and Reid’s Dome
                                           State Gas Limited has been appointed   will be exported through a single pipeline,
       Beetaloo exploration                Preferred Tenderer (on a 100% basis) of   currently being planned by State Gas. The
                                           substantial new acreage (PLR 2020-1-5) the
                                                                                Company has identified two potential routes
       program resumes                     latest Queensland Government Petroleum   for an export pipeline (shown below), one
                                           Land Release. West of Rolleston in Central
                                                                                of which passes through Rolleston-West,
       Origin has resumed activity at the Kyalla well   Queensland, Block 5 surrounds the northern   and has recently obtained Petroleum Survey
       site near Daly Waters, as part of the Beetaloo   part of the Company’s existing 100% owned   Licence 2049 which traverses a major part of
       Exploration Project.                PL231, where it is developing the Reid’s Dome   the new permit and will enable on-the-ground
         Work was temporarily paused in March   Gas Project to bring gas to market to meet   investigations of both routes.
       this year in response to COVID-19 and to   forecast shortfalls in the east coast domestic   STATE GAS, September 23, 2020





































       Week 38   24•September•2020              www. NEWSBASE .com                                             P19
   14   15   16   17   18   19   20