Page 11 - AfrElec Week 35 2021
P. 11

AfrElec                                      RENEWABLES                                              AfrElec


       Sungrow wins solar hybrid deal




       at Egyptian mine




        AFRICA           CHINESE inverter supplier Sungrow is to sup-  station.
                         ply equipment to Juwi Renewable Energy for   Alvin Shi, managing director of Sungrow
                         a hybrid 36-MW off-grid solar farm and a 7.5-  MENA region, said: “We would love to provide
                         MW battery energy storage system at the Sukari  the best of environmental sustainability with
                         gold mine in Egypt.                  cutting-edge PV and storage portfolio as a piv-
                           The project will be the largest solar-plus-stor-  otal player in the industry. The solar-plus-stor-
                         age plant at a mine site, which should facilitate  age micro-grid solution is also an ideal solution
                         the energy transition for minerals in the Middle  for regions with power outages or high power
                         East North Africa region.            demand.”
                           The project at the Sukari gold mine operated   The project is scheduled to be commissioned
                         by Centamin is located near the Red Sea, which  in the first half of 2022. It will cut the mine’s diesel
                         means it faces the challenge of scorching heat  consumption by about 20 to 22mn litres a year.
                         and high corrosion.                  This would offset between 53,000 and 60,000
                           Mining operations are keen to decarbonise  tonnes per year (tpy) of CO2 emissions.
                         and use off-grid solar and storage technology to   The solar-plus-storage installation will enable
                         meet their energy needs.             Centamin to reduce its mine’s electricity bills as
                           Sungrow is to supply a 1,500V, 6.25-MW PV  the operator will partially shift away from fuel
                         inverter solution with a highly integrated energy  which is often volatile in price.
                         storage system with lithium iron phosphate   Dave Manning, director Global Hybrid at
                         (LFP) batteries.                     Juwi, said: “This global flagship project high-
                           Smart forced air-cooling technology and a C5  lights significant benefits that African mines can
                         high anti-corrosion capacity will help it operate  unlock with solar battery hybrid solutions.”
                         stably in the harsh conditions.        The mining industry accounts for 10% of the
                           Juwi’s solar system uses a bifacial solar PV  global energy consumption and many minerals
                         module and single-axis tracking system, which  play a vital role for the energy transition.
                         should help it take advantage of the high irradi-  Juwi has been working with mining clients
                         ance at the site. The solar and battery system will  ever since its first utility-scale solar battery
                         be integrated into the existing off-grid network  hybrid project at the DeGrussa Copper Mine and
                         and support the operation of the existing power  then at Agnew Gold Mine, both in Australia.™










































       Week 35   02•September•2021              www. NEWSBASE .com                                             P11
   6   7   8   9   10   11   12   13   14   15   16