Page 18 - AfrOil Week 09 2023
P. 18

AfrOil                                       NEWS IN BRIEF                                             AfrOil








       During drilling operations at the well, the crew  green ammonia production to satisfy the needs  prospective resource potential and individual
       encountered 22 metres of net oil pay in the pri-  of Egypt’s domestic market and increase exports.  prospects estimated at 100-700mn barrels each.
       mary Alam El Bueib reservoir target in line with   Scatec commissioned the first phase of Egypt   Genel has launched a process to find a part-
       pre-drill expectations.             Green’s green hydrogen plant in Ain Sokhna,  ner to take a material equity position and jointly
         The well will be completed and tested in the  Egypt, during COP27 held in Sharm El Sheikh  pursue the exploration programme in the block,
       coming days and can then be brought immedi-  in November 2022. When fully developed, it will  with the opportunity to drill and test one of the
       ately onstream through the existing ASH facili-  consist of 100 MW of electrolysers, powered by  high-graded prospects.
       ties, adding additional production and revenue  260 MW of solar and wind power. The facility   bna/IntelliNews, 02 March 2023
       for UOG.                            will deliver up to approximately 15,000 tonnes
         UOG is an oil and gas company with a port-  per year of green hydrogen as feedstock for pro-  Tanzanian billionaire’s Taifa
       folio of low-risk cash-generative production  duction of up to 90,000 tpy of green ammonia in
       and development assets across Egypt and the  Fertiglobe’s existing ammonia plants.  Gas enters Kenya, set to
       UK. Abu Sennan is located about 200 km west   bna/IntelliNews, 27 February 2023
       of Cairo. The concession consists of seven devel-                        shake local LPG market
       opment leases apart from exploration licences   Genel Energy signs
       across a total area of 644 square km.                                    Tanzanian LPG company Taifa Gashas officially
         The Abu Sennan concession was estimated   Petroleum Agreement for      entered the Kenyan market on Friday (February
       to hold gross 11.5mn barrels of oil and 10.1bn                           24) with the commissioning of the construction
       cubic feet (286mn cubic metres) of gas in proven   the Lagzira block     of a 30,000-tonne facility at the Special Eco-
       and probable reserves as of December 2019. The                           nomic Zone in Dongo Kundu, near the port of
       commercial production at the concession started  Genel Energy has announced that a Petroleum  Mombasa, Business Daily reports.
       in July 2012 with an initial production rate of  Agreement and Association Contract has now   The $130mn plant is set to nearly double Ken-
       2,200 barrels per day (bpd) of oil and 3.5mn  been signed with the Office National des Hydro-  ya’s LPG storage capacity in what is expected to
       cubic feet (99,100 cubic metres) of gas a day.  carbures et des Mines (ONHYM) regarding  help stabilise and reduce the prices of cooking
       bna/IntelliNews, 02 March 2023      the Lagzira block (75% working interest and  gas. Data from the Energy and Petroleum Reg-
                                           operator).                           ulatory Authority shows consumption of LPG
       Egyptian public sector              ration term (in three exploration periods), with  13.9% increase from the 320,909 metric tonnes
                                              The Agreement is for a full eight-year explo-
                                                                                in Kenya reached 373,865 tonnes in 2021, a
       companies and Norway’s              attractive fiscal terms.             recorded in 2020.
                                                                                  The government has allocated the company
                                              The Lagzira block (formerly Sidi Moussa) is
       Scatec sign deal to invest in       a large offshore licence, in water depths of 200-  30 acres of land from the 3,000 acres that have
                                           1,200 metres, with a proven petroleum system  been set aside for the Dongo Kundu SEZ project,
       green ammonia production            following Genel’s 2014 SM-1 well, which recov-  The Star reports.
                                           ered oil from the Upper Jurassic reservoirs.
                                                                                  Taifa Gas Investment SEZ Limited managing
       Two Egyptian public sector companies, Egyptian   New multi-azimuth broadband 3D seismic  director Veneranda Masoum said they expected
       Petrochemicals Holding Company (ECHEM)  acquired in 2018 by Genel resulted in a signif-  to bring healthy competition in the gas industry
       and Misr Fertilizers Production Company  icant uplift and improvement in subsurface  in Kenya because of their lower prices.
       (MOPCO), have agreed with Norway’s Scatec to  imaging, and prospects have been high-graded,   The entry into Kenya of Taifa Gas, owned by
       invest in a new domestic green ammonia pro-  with follow on potential in the wider area. The  billionaire Rostam Aziz, is part of a trade deal
       duction facility using green hydrogen.  data has highlighted new plays and provided an  agreed upon in 2021 by Kenya’s former president
         Scatec is a leading company in the field of  enhanced understanding of the SM-1 well result.  Uhuru Kenyatta and the current head of state of
       green energy solutions and has the expertise   In total, 18 prospects and leads have been  Tanzania, Samia Suluhu Hassan.
       needed to build the new integrated complex for  identified, with over 2.5bn boe mean recoverable   bna/IntelliNews, 02 March 2023





























       P18                                     www. NEWSBASE .com                      Week 09   02•March•2023
   13   14   15   16   17   18   19   20   21