Page 13 - GLNG Week 08 2021
P. 13

GLNG                                       NEWS IN BRIEF                                              GLNG







       cargo capacity, flexibility and fuel economy,   Arctic LNG 2 project.    Ratio (AER) curve used to secure preferable
       as well as the proven performance of the   The SPA stipulates the cumulative supply   funding under the Poseidon Principles. This
       built Polar Code C.Delta2150 design. It   of more than 3mn tonnes of LNG for a term   extends the average seven-year additional
       provides a flexible platform for a whole series   of 15 years and will be delivered to LNG   competitive advantage for Poseidon Principle
       of designs, which can be adapted to various   terminals in China on DES basis.  loans achieved with LNG alone.
       customers’ requirements as a result of several   “Our LNG commercial strategy is to   The analysis compares LNG plus bio-LNG
       optional feature studies. The platform design   diversify our client base and target end   from a zero-carbon, sustainable source with
       is “future-proof”, taking into consideration   consumers in the fast-growing Asian Pacific   conventional vessel fuels such as HFO, VLSFO
       possibilities to use alternative fuels to reduce   region, and the LNG volumes produced from   and MGO. Bio-LNG is fully compatible with
       carbon footprint or even zero-emission power   our Arctic LNG 2 project is core to our long-  existing LNG infrastructure and technologies
       production.                         term objective of delivering affordable, secure   and increasingly recognised as a sustainable
         The choice of the main dimensions (length,   and sustainable natural gas for many decades,”   fuel that can be ‘dropped in’ and blended with
       breadth, block coefficient in combination with   noted Leonid Mikhelson, Novatek’s Chairman   LNG. Therefore, it represents one of the most
       a larger propeller) in total results in a higher   of the Management Board. “The Chinese   viable pathways to decarbonisation currently
       speed respective in less power demand at the   market is one of the key regions in our LNG   available to owners.
       design speed/contract point compared with   marketing strategy, and we plan to further   LNG fuel delivers greenhouse gas (GHG)
       reference designs.                  increase our supplies of liquefied natural gas   reductions of up to 21% Well-to-Wake and up
         The platform design includes ice class 1A   to this country.”          to 28% Tank-to-Wake. This means that LNG
       for unlimited Baltic Sea operation. The vessel   NOVATEK, February 25, 2021  vessels perform well according to Poseidon
       is equipped with lashing bridges to access                               Principles’ funding criteria, which were
       reefer containers.                  Every 10% of bio-LNG drop-           instigated by financial institutions to improve
       DELTAMARIN, February 25, 2021                                            strategic decision-making and shape a better
                                                                                future for the shipping industry and society.
       Novatek and Shenergy                in gives another two years           towards these objectives using an AER
                                                                                  The Poseidon Principles measure progress
                                           ‘runway extension’ for GHG
       Group Sign SPA for LNG from         reduction compliance                 scoring. This follows an ever-tightening
                                                                                decarbonisation trajectory index to 2050,
       Arctic LNG 2                        New analysis from SEA-LNG, the coalition   requiring a vessel’s aggregate carbon emissions
                                                                                intensity to improve. This measure is intended
       Novatek announced today that its wholly   for accelerating LNG as a marine fuel, has   to align with and incentivise the IMO’s goals
       owned subsidiary, Novatek Gas & Power   determined that for every 10% of bio-LNG   of reducing the total annual GHG emissions
       Asia, and Shenergy Group signed a long-  dropped in and blended with LNG as a   by at least 50% by 2050.
       term LNG Sales and Purchase Agreement   marine fuel, a vessel can achieve two extra   SEA-LNG, February 25, 2021
       (SPA) for the LNG produced from the   years’ compliance with the Annual Efficiency











































       Week 08   26•February•2021               www. NEWSBASE .com                                             P13
   8   9   10   11   12   13   14   15