Page 22 - AsianOil Week 42
P. 22

AsianOil                                     NEWS IN BRIEF                                           AsianOil







       SOUTH ASIA                          that this pilot project will be unique. It will   Applications are now fixed to be heard on
                                           help the county and the world as a whole.  10 November 2020 at 10am. The Singapore
       Pradhan inaugurates                 INDIANOIL, October 20, 2020          Court has also directed that any party who
                                                                                objects to any of the Scheme Applications is
       IndianOil’s H-CNG plant             SOUTHEAST ASIA                       to file an affidavit by 27 October 2020, 4pm;
                                                                                the company is to file the reply affidavit, if
       Minister of Petroleum & Natural Gas and                                  any, by 3 November 2020, 4pm. The following
       Steel Dharmendra Pradhan inaugurated   Perta Arun Gas, Natuna Eton       are to be tendered to court by 5 November
       IndianOil’s compact reformer plant and                                   2020, 4pm: (i) submissions and bundle of
       launched the much-awaited trial run of Delhi’s   sign MoU                authorities which are to be exchanged and
       buses on Hydrogen-blended CNG (HCNG)                                     tendered to court; (ii) the attendance list of
       here today at the Rajghat Bus Depot-I of   In order to achieve business targets, Perta   parties who wish to attend, indicating whether
       DTC. In India’s quest to promote Hydrogen   Arun Gas signed a Memorandum of   the party attending is supporting or opposing
       as a clean fuel for the mobility sector,   Understanding (MoU) with PT Natuna Eton   any of the Scheme Applications; and (iii) a
       Hydrogen-blended HCNG is emerging as an   Energy. The MoU, which was signed by the   time bank.
       excellent interim technology for achieving   President Director of PAG, Arif Widodo and   KRISENERGY, October 21, 2020
       emissions reduction and import substitution.   President Director of Natuna Eton Energy,
       Refueling of H-CNG blends in vehicles can   Tieso Ozeki, is about Exploring Potential
       be performed with minimum modifications   Cooperation for the development of LNG   EAST ASIA
       in the infrastructure that is currently under   Storage Facilities at the Arun LNG Refinery.
       use for dispensing CNG. Shri Kailash Gahlot,   In his remarks, Arif Widodo explained   JERA starts LNG bunkering
       Minister of Transport, Government of Delhi,   that the signing of this MoU was a
       was also present on occasion.       symbol of the cooperation between    business in Chubu
         Speaking on the occasion, Shri Pradhan   PAG and Natuna Eton Energy in the
       said that providing clean and reliable energy   context of conducting a joint study on   JERA has started an LNG bunkering
       supplies to 130 crore plus Indians is the   the construction of LNG storage facilities   business in the Chubu region of Japan
       top most priority of the Government.  He   to support the LNG Hub business   through its Central LNG joint venture with
       said that India will emerge as a winner in   opportunities and the fulfillment of the   Kawasaki Kisen Kaisha, Ltd., Toyota Tsusho
       developing the solutions, the world would   LNG market in China and Southeast Asia.  Corporation, and Nippon Yusen Kabushiki
       admire for the decades ahead. The Minister   “This is of course a great potential in the   Kaisha (NYK). On 20 October, the Central
       mentioned that Prime Minister Shri   development of PAG’s business and also in   LNG-owned LNG bunkering vessel Kaguya
       Narendra Modi is committed to usher in   accordance with PAG’s vision, which is to   supplied LNG to Sakura Leader, an LNG-
       clean energy future that has minimal impact  become a World Class Regasification and   fueled PCTC (pure car and truck carrier)
       on the environment. Complimenting the   LNG Hub Company. We hope that in the   operated by NYK that is under construction
       initiatives of IndianOil, the Minister said,   early stages of the implementation of the   at Shin Kurushima Toyohashi Shipbuilding
       “I am happy to note that the scientists of   Study covering technical and commercial   Co., Ltd. This is the first time LNG fuel has
       IndianOil R&D have risen to the occasion   aspects it can be completed within the next   been supplied through ship-to-ship LNG
       and have developed an innovative compact   6 months,” said Arif.         bunkering in Japan.
       reforming technology for production of   PERTAMINA, October 20, 2020       The International Maritime Organization
       Hydrogen-mixed CNG.” Elaborating on                                      (IMO) has established the goal of reducing
       the importance of Hydrogen in facilitating   KrisEnergy updates on       greenhouse gas (GHG) emissions from
       India’s energy transformation, Mr. Pradhan                               shipping by at least 50 percent by 2050
       mentioned, “Hydrogen is the ultimate fuel,   restructuring process       compared to 2008, and many LNG-fueled
       which, while giving energy, produces clean                               ships are expected to be produced going
       water in the emissions. Apart from this, it   KrisEnergy, an independent upstream oil and   forward. JERA, together with its business
       has many other virtues as the capacity to get   gas company, wishes to announce that the   partners, established Central LNG in May
       the rural sector involved with the energy   Singapore Court has re-fixed the hearings   2018 in preparation for the launch of its
       sector through biomass”.  The Minister said   of the Scheme Applications. The Scheme   LNG bunkering business. Construction of
                                                                                Japan’s first LNG bunkering vessel, Kaguya,
                                                                                began at Sakaide Works (Kawasaki Heavy
                                                                                Industries, Ltd.) in July 2018 and was
                                                                                turned over to Central LNG this September.
                                                                                  The LNG fuel supplied by Kaguya was
                                                                                loaded between 16 and 17 October this year
                                                                                at JERA’s Kawagoe Thermal Power Station.
                                                                                Existing facilities at Kawagoe Thermal Power
                                                                                Station were modified beginning in July
                                                                                2018 to coincide with the start of the LNG
                                                                                bunkering business. Going forward, Kaguya
                                                                                will be based at Kawagoe Thermal Power
                                                                                Station as Central LNG further develops the
                                                                                LNG bunkering business in the Chubu region.
                                                                                JERA, October 21, 2020


       P22                                      www. NEWSBASE .com                        Week 42   22•October•2020
   17   18   19   20   21   22   23   24