Page 13 - AsiaElec Week 31 2021
P. 13

AsiaElec                                    NEWS IN BRIEF                                           AsiaElec








                                                                                available in the market. These high-powered
                                                                                products currently produced by Trina Solar
                                                                                are making room for the 670W successor,
                                                                                which can already be ordered for next year.
                                                                                  “Trina Solar has the most advanced
                                                                                technology and the most powerful modules
                                                                                with great performance. This, for sure, helped
                                                                                Focus to choose us,” said Álvaro García
                                                                                Maltrás, Trina Solar’s vice president for Latin
                                                                                America and the Caribbean.
                                                                                  According to Focus Energia, the project’s
                                                                                energy production will be entirely destined for
       to optimise efficiency and maximise the use of   certificate for the solar farm, to be developed   the free market. The strategy follows the latest
       renewable generation.               by Prime Road Alternative.           trend in which renewable energy generation
         The Gruyere microgrid is expected to be   In February, the ADB approved a $16.4mn   entrepreneurs tend to prefer to negotiate
       commissioned in the fourth quarter of 2021.  loan for the project. The Metro Manila-based   directly with clients, instead of competing
         “We are at the forefront of this energy   lender noted in a September 2019 press   in auctions promoted by Aneel, to serve the
       journey, and we are proud to be so,” Mathews   release that auction for the project, which   captive market exclusively.
       said on Wednesday.                  was conducted by EdC, ended with Prime   According to Alan Zelazo, Focus CEO, it
                                           Road Alternative’s lowest bid of $0.3877 per   is estimated that 2 thousand direct jobs and
                                           kilowatt-hour.                       4 thousand indirect jobs will be generated
                                              And another 60MW solar power farm in   during the system’s implementation.
       SOL AR                              Teuk Phos was commissioned and connected   Furthermore, Futura 1 comes at an
                                           to the national grid in April, which brought   opportune moment. “Despite being a long
       Cambodia’s Kampong                  the Kingdom’s total solar power capacity to   term project, we are pleased to collaborate
                                                                                with the country to increase its production
                                           150MW, according to Ministry of Mines and
       Chhnang solar farm to               Energy director-general for Energy Victor   capacity in an extremely severe hydric crisis
                                           Jona.
                                                                                period.”
       break ground                        Taing Krasaing commune, is developed by   550 people working on site. Operations are
                                              The project, located in Romeas village,
                                                                                  The project is already underway and has
       Prime Road Alternative (Cambodia) will soon   SchneiTec Renewable Co Ltd, a joint venture   scheduled to begin in April 2022.
       break ground on a 60MW solar power plant   between Chinese and local partners, he said.  Operating in Brazil since 2017, Trina Solar
       in southwestern Kampong Chhnang province   According to the EdC, the national grid   sees great potential in the country. “Brazil
       valued at $37.4mn.                  reached 320MW of capacity from solar   is Latin America’s leading market for solar
         Provincial Department of Mines and   generation facilities after a 60MW project   energy. It is a super dynamic market in high
       Energy director Uk Ros told the Phnom Penh   was commissioned in northern Battambang   growth and a priority for Trina Solar. We
       Post on July 28 that the project would be built   province’s Thma Koul district in March.  entered a little later than our competitors, but
       over a year and a half in Teuk Phos district,                            we are now consolidating ourselves in the
       near the border with Samaki Meanchey                                     country,” says Alvaro.
       district to the southeast, with financial                                TRINA SOLAR
       support from the Asian Development Bank   SOL AR
       (ADB).
         Prime Road Alternative has purportedly   China’s Trina Solar ships     SOL AR
       completed an impact resolution process
       involving potentially-affected villagers, at the   600W+ series Vertex   Indonesia begins
       instruction of local authorities over concerns
       about damage to crops in the vicinity, he said.  modules to Brazil       construction of SE Asia’s
         The company will sell the power generated
       by the solar farm to state-owned utility   Trina Solar is the major vendor of   largest solar power plant
       company Electricite du Cambodge (EdC) to   photovoltaic modules for the Futura 1 Project,
       supply the national grid and distribute the   a project with 22 solar energy parks, which is   Indonesia is stepping up its efforts to reach
       electricity throughout the country, especially   being developed by Focus Energia, in Juazeiro,  clean energy targets with the construction of
       to areas with energy shortages, he added.  Bahia, Brazil.                a 145-MW floating solar power plant, set to
         “Kampong Chhnang province has received   The project will be implemented in three   be the largest in Southeast Asia, the Jakarta
       a series of solar energy projects due to its   phases. The first phase has an installed   Globe reported.
       favourable geographical location which   capacity of 850 MWp, which places the project   The project, with constructions underway
       receives ample sunlight, and we have two   among the largest in Brazil, at the moment.  in West Java, secured financing from state
       substations to transmit electricity to the   The initial modules will leave China in 108   utility company Perusahaan Listrik Negara
       national grid,” Ros said.           containers in the second week of August with   (PLN) and Masdar of United Arab Emirates
         On January 5, the Council for the   59,292 pieces of 600W series of modules. The   this week.
       Development of Cambodia (CDC) announced  bifacial modules, with 210 mm cells, belong   Solar may be Indonesia’s best shot of
       that it had approved a final registration   to the Vertex line, with the latest technology   reaching its short-term clean energy target, an



       Week 31   04•August•2021                 www. NEWSBASE .com                                             P13
   8   9   10   11   12   13   14   15   16