Page 5 - Allisons Newsletter, Lakewood Village in Long Beach - Sept 2018 Issue
P. 5

revitalize l



         DIY - DECK REDO:





               RESURFACE IN A WEEKEND



        by BPT                         decking is a doable DIY project that  ground up by examining the footings,   STEP 4: Install new deck boards
                                       can be completed over the course of  posts and joists. Pay close attention   Begin laying out the new
                utdoor living season means  a weekend or two with just a little  to  the  condition  of  the  wood.  Soft  composite boards. Starting near the
                backyard BBQs, yard games  know-how and  the help of a few  wood indicates rot and should be  house, face screw the first board to the
        O and relaxing with a good  friends,” explains Adam Zambanini,  replaced before proceeding. If the  frame. Closely follow the instructions
        book or good friends. If you own a  Vice President of marketing for Trex  existing framing and substructure are  for spacing from the manufacturer’s
        wood deck, however, it also means  Company.  “You  get a brand-new  sound, you’re good to go.  installation guide. As you progress,
        considerable time and money spent on  deck for a lot less money than starting   Tip: To help ensure your substructure  check the spacing between the house
        seasonal maintenance and deck repairs. from scratch—and a lot less hassle  lasts as long as your new composite deck  and the deck boards to make sure they
          While wood decks are aesthetically  through the years.”     boards, use a protective tape, such as  stay parallel with the house. Correct
        pleasing,  properly  maintaining  them   Designed for maximum durability  TrexProtect, to shield wooden joists  variations a little at a time over several
        requires regular stripping, sanding  and minimal maintenance, wood- and beams from moisture that can lead  rows to avoid large, tapered gaps.
        and staining. The process is labor- alternative  decking  is  resistant  to  to rot and the loosening of deck screws
        intensive, time-consuming, messy  fading, staining, scratching and  and fasteners.            STEP 5: Complete with railing
        and costly—averaging between $540  mold and, unlike wood, requires no                          Measure for each post location,
        and $1,050 each time, according to  sanding, staining or sealing. Just an   STEP 2: Remove old deck boards  and cut placement holes with a jigsaw.
        HomeAdvisor.com.               occasional soap-and-water cleaning   Remove any existing railing and  Then, drop the posts into the holes
          Consider this: For the same  is all that is needed to retain a “like- begin prying up the nailed decking  and bolt them securely. Slide sleeves
        time  and  energy  you  would  spend  new” appearance and durability for  boards, leaving the substructure and  over the posts and assemble railing
        maintaining and repairing those old  decades.                 framing in place. Start from the  and balusters per the installation
        wood boards, you could replace them                           outside and move toward the house  guide. Finish off by adding your
        with a deck made of structurally   READY TO RESURFACE?        so you have a solid, safe platform  choice of decorative elements, such as
        superior composite material—and   Follow these simple steps to a new  from which to work.   post caps and top rail caps.
        never again have to worry about  deck surface that you can spend less
        upkeep. As long as  the structural  time maintaining and more time   STEP 3: Level it out      For more guidance on deck
        framework  of  your  existing  deck  is  enjoying:              To ensure a level surface for the  resurfacing, watch a step-by-step
        intact and in good condition, you are                         new deck boards, make sure the  video from Trex at https://youtu.be/
        a candidate for deck resurfacing.  STEP 1: Examine the substructure  joists  are  flat  and  even  with  one  ZI8CYwI0MYM.   n
          “Resurfacing an aging or decaying   Before removing any boards, check  another. If any joists are bowed, you
        wood deck with new composite  your deck’s foundation. Start from the  may need to plane or cut them.      ©2018 Brandpoint.                    HOME IMPROVEMENT

































                   “As long as the
                structural framework
              of your existing deck is
                 intact and in good

                condition, you are a
                 candidate for deck
                    resurfacing.”
































                                                                                                                                                         5
   1   2   3   4   5   6   7   8   9   10