Page 202 - Randy Penn Everything Knots Book
P. 202

37-032-6-pp001-pp274.qxd  9/1/2010  2:49 PM  Page 187






                                                             KNOTS FOR LASHING


                                                Marling
                       This type of lashing relies on Marling Hitches to hold the contents of a
                       bundle firmly in place.


                       1  Start by securing the rope around the end of the bundle with a Timber
                          Hitch (see Chapter 7). Lead the running end partway down the
                          bundle, make another wrap, and tuck the running end over and
                          under, as shown.




















                       2  Continue with a few additional wraps along the length of the
                          bundle. To secure the last Marling Hitch, tie one or two Half Hitches.





















                          In forming each Marling Hitch, the running end is brought over and
                       then under. If you tie each by going under then over, they form a series of
                       Half Hitches, making a parcel tie called Single Hitches. Using Marling
                       Hitches holds the bundle more securely, but takes longer to untie.

                                                                                    187
   197   198   199   200   201   202   203   204   205   206   207