Page 55 - A:STPAGE2.PDF
P. 55

EM 1110-2-2300
        31 Jul 94

        EM 1110-2-1601                                       EM 1110-2-3600
        Hydraulic Design of Flood Control Channels           Management of Water Control Systems


        EM 1110-2-1602                                       EM 1110-2-3800
        Hydraulic Design of Reservoir Outlet Works           Systematic Drilling and Blasting for Surface Excavations

        EM 1110-2-1603                                       ETL 1110-2-231
        Hydraulic Design of Spillways                        Initial Reservoir Filling Plan. (ETL’s are temporary doc-
                                                             uments and subject to change.)
        EM 1110-2-1901
        Seepage Analysis and Control for Dams                ETL 1110-2-316
                                                             Date Base for Automated Geotechnical Instrumentation
        EM 1110-2-1902
        Stability of Earth and Rock-Fill Dams                CEGS-01440
                                                             Contractor Quality Control
        EM 1110-2-1906
        Laboratory Soils Testing                             CW-02212
                                                             Embankment (For Earth Dams)
        EM 1110-2-1907
        Soil Sampling                                        CW-02214
                                                             Soil-Bentonite Slurry Trench Cutoffs
        EM 1110-2-1908
        Instrumentation of Earth and Rock-Fill Dams -        CW-03365
        Parts 1 and 2                                        Concrete for Cutoff Walls
        EM 1110-2-1911                                       A-2. Related Publications 2
        Construction Control for Earth and Rock-Fill Dams
                                                             ACI Committee 230 1990
        EM 1110-2-1913                                       ACI Committee 230. 1990 (Jul-Aug). “State-of-the-Art
        Design & Construction of Levees                      Report on Soil Cement,” ACI Materials Journal, Vol 87,
                                                             No. 4, American Concrete Institute, Detroit, MI.
        EM 1110-2-1914
        Design, Construction, and Maintenance of Relief Wells  Albritton, Jackson, and Bangert 1984
                                                             Albritton, J., Jackson, L., and Bangert, R.  1984 (Oct).
        EM 1110-2-2202                                       “Foundation Grouting Practices at Corps of Engineers
        Dam Safety Preparedness                              Dams,” Technical Report GL-84-13, U.S. Army Engineer
                                                             Waterways Experiment Station, Vicksburg, MS.
        EM 1110-2-2300
        Earth and Rock-Fill Dams General Design and Construc-  American Society for Testing and Materials 1990
        tion Considerations                                  American Society for Testing and Materials. 1990 (Aug).
                                                             “Field Measurement of Infiltration Rate Using a Double-
        EM 1110-2-2302                                       Ring Infiltrometer with a Sealed-Inner Ring,” ASTM
        Construction with Large Stone                        D 5093-90, Philadelphia, PA.

        EM 1110-2-2502
        Retaining and Flood Walls


        EM 1110-2-2503
        Design of Sheet Pile Cellular Structures Cofferdams and  ________________________
        Retaining Structures                                 2  References available on interlibrary loan from the
                                                             Research Library, U.S. Army Engineer Waterways Exper-
        EM 1110-2-3506                                       iment Station, ATTN:  CEWES-IM-MI-R, 3909 Halls
        Grouting Technology                                  Ferry Road, Vicksburg, MS 39180-6199.



        A-2
   50   51   52   53   54   55   56   57   58   59   60