Page 2 - FINAL REPORT SINAR MATARAM
P. 2
TABLE OF CONTENT
COVER PAGE 1
TABLE OF CONTENT 2
1. INTRODUCTION
1.1. GENERAL INFORMATION 4
1.2. LOCATION OF MT SINAR MOROTAI 5
1.3. VESSEL DETAILS 6
2. DETAILED UNDERWATER WORKS
2.1. UNDERWATER WORK RESULT 8
2.2. JOB SAFETY ANALYSIS (JSA) 9
2.3. PHOTOGRAPHS INSPECTION 10
2.4. PERSONNEL 33
2.5. EQUIPMENTS 33
2.6. DAILY REPORT 33
APPENDIX 01 – WORK PERMIT FORM 35
APPENDIX 02 – JOB SAFETY ANALYSIS (JSA) 37
APPENDIX 03 – ATTANDENCE LIST (TOOLBOX) 39
APPENDIX 04 – DAILY REPORT 41
APPENDIX 05 – DIVE RECORD 43
APPENDIX 06 – OFFICIAL REPORT COMPLETION AND HANDOVER WORKING RESULT 45
APPENDIX 07 – PERSONNEL RESUME 47
PT SAMUDERA MBIANTU SESAMI SALVAGE AND UNDERWATER WORK SERVICES
Final Report Underwater Work of Rope/Net Removal from Bow Thruster and Propeller M/E Page 2 of 49