Page 4 - FINAL REPORT_MT SINAR MOROTAI_03062023
P. 4
1. INTRODUCTION
1.1 GENERAL INFORMATION
Based on the Work order No.B.9446 confirmation on January 31, 2023, by email from
PT Samudera Indonesia Ship Management concerning the implementation of
underwater work of rope/net removal from bow thruster and Propeller M/E MT Sinar
Maratam an located-on Tanjung Gerem Anchorage, Merak - Indonesia.
The underwater work of rope/net removal from bow thruster and Propeller M/E MT
Sinar Maratam commenced on June 03, 2023. During the underwater work was
attended by Master of Sinar Mataram (Capt. Alderin J. Palenewen) and Chief
Engineer and PT Samudera Mbiantu Sesami diving team.
The scope of work underwater includes visual inspections (photo & video) by the
diver used underwater camera before and after execution rope/net removal.
Figure 1 – MT SINAR MATARAM 03/06/2023
PT SAMUDERA MBIANTU SESAMI SALVAGE AND UNDERWATER WORK SERVICES
Final Report Underwater Work of Rope/Net Removal from Bow Thruster and Propeller M/E Page 4 of 49